【24h】

GEOTECHNICAL ENGINEERING PRACTICES IN BEIJING AREA

机译:北京地区的岩土工程实践

获取原文
获取原文并翻译 | 示例

摘要

Expanded rapidly in recent years from its ancient city proper to an area covers more than 1,500km~2, Beijing has been undergoing an enormous changing and erected within and around it Many high-rises, crossroads and municipality works have been erected within and around the city. Imaginably, many new geotechnical engineering problems are in turn raised in front of the engineers badly needed to be solved, amongst witch those related to high-rise and underground structures have been proved to be critical ones. Four main aspects of the problems encountered will be discussed in this paper. They are: 1 uneven settlement analysis and controlling; 2 the regulations of groundwater distribution and its impact on foundation engineering; 3 the assessment of seismic safety for engineering sets; 4 the need of establishing GIS and putting it into practice.
机译:近年来,北京从其古老的城市迅速扩展到覆盖超过1500 km〜2的区域,北京发生了巨大的变化,并在其内部和周围竖起了许多高层建筑,十字路口和市政工程。市。可以想象,在工程师面前急需解决许多新的岩土工程问题,其中与高层和地下结构有关的问题已被证明是至关重要的。本文将讨论遇到的问题的四个主要方面。它们是:1不均匀沉降分析与控制; 2。 2地下水分布规律及其对基础工程的影响; 3工程装置的地震安全性评估; 4建立GIS并将其付诸实践的需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号