FEASIBILITY STUDY OF TWO PHASES OPERATION OF A DOUBLE-CIRCUIT TRANSMISSION LINE WITHOUT ACTIVE COMPENSATION FOR THE DISSYMMETRY

机译:双回路输电线路两相运行不对称性不作主动补偿的可行性研究

获取原文
获取原文并翻译 | 示例

摘要

In the event of a permanent earth fault on a transmission line the common practice is to switch off the two unfaulted phases as well, although they could temporarily transport power during heavy load conditions. This paper investigates the possibility to operate a double-circuit transmission line with one circuit having a phase unavailable without active compensation for the unbalance. This two phases operation mode can be considered as an extension of the single pole autoreclosure scheme.rnSimulations and field tests in the 220 kV Swiss power system show some aspects of this unusual operation mode. It turns out that in a powerful network, the temporary (30...60 minutes) two phases operation mode of the faulted line does not necessarily produce dangerous unbalance and leads to economical and operational advantages when managing overload conditions.rnThe asymmetrical operation mode also has drawbacks, which must be carefully considered for each individual network configuration. Its feasibility depends onrn1. Physical limitations: The unbalance produced by the single pole opening results in zero and negative sequence current flows that can stress or overload equipments such as generators, transformers.rn2. Technological limitations: Many protection and control devices are designed for symmetrical normal conditions and could be disturbed by the asymmetrical operation.rnThe paper begins with both these essential aspects of the two phases operation. Then it presents field tests results made on a 220 kV double-circuit transmission line, that enables to check the previous simulations of the feasibility study. Finally, the paper discusses the benefits and drawbacks of an effective application for the proposed scheme and concludes with some practical recommendations and comments for other operators.rnThe following conclusions can be drawn from the investigations and field tests presented in this paper:rn1. The two phases operation of one circuit of a double transmission line is not so critical as one could have initially thought and can be effectively applied in the network configuration presented. The scheme takes advantage of the parallel circuits providing compensation for the asymmetry.rn2. Simulations are reliable tools to assess the feasibility of the scheme and must be performed for each individual network configuration.rn3. The consequences for all the equipment should be investigated carefully.rn4. The scheme is mainly applicable in powerful and well interconnected systems.rn5. Two phases operation could represent an economical alternative to dynamically manage overload situations, increase the flexibility of the power system and help in contingency situations.rn6. The two phases operation scheme could be implemented in practice via the protection relay.
机译:如果传输线上发生永久性接地故障,通常的做法是也要关闭两个无故障相,尽管它们可以在重负载条件下临时传输电力。本文研究了在不具有主动补偿不平衡的情况下,使用具有一个相位不可用的电路的双回路传输线的可能性。这两个阶段的操作模式可以看作是单极自动重合闸方案的扩展。rn在220 kV瑞士电力系统中的仿真和现场测试显示了这种不正常操作模式的某些方面。事实证明,在功能强大的网络中,故障线路的临时(30 ... 60分钟)两阶段运行模式不一定会产生危险的不平衡,并且在管理过载情况时会带来经济和运行优势。有一些缺点,对于每个单独的网络配置,都必须仔细考虑。其可行性取决于rn1。物理限制:单极断开产生的不平衡会导致零序和负序电流流动,从而使设备(如发电机,变压器)产生压力或过载。技术上的局限性:许多保护和控制设备都是为对称的正常条件而设计的,并且可能会受到非对称操作的干扰。本文从两阶段操作的这两个基本方面开始。然后,它介绍了在220 kV双回路输电线路上进行的现场测试结果,从而可以检查先前的可行性研究模拟。最后,本文讨论了对所提出的方案进行有效应用的利弊,并为其他运营商提供了一些实用的建议和意见。rn以下结论可以从本文提出的调查和现场测试中得出:rn1。双传输线的一个电路的两相操作并不像最初想的那么关键,并且可以有效地应用于所介绍的网络配置中。该方案利用了并联电路为不对称提供补偿。仿真是评估该方案可行性的可靠工具,必须针对每个单独的网络配置进行仿真。对所有设备的后果应仔细调查。该方案主要适用于功能强大且互连良好的系统。两阶段运行可以代表一种经济的替代方案,可以动态地管理过载情况,增加电力系统的灵活性并在紧急情况下提供帮助。实际上,可以通过保护继电器实现两阶段运行方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号