【24h】

Design and supply of mechanical equipment for the Muela Power Station, Lesotho

机译:莱索托Muela电站机械设备的设计和供应

获取原文
获取原文并翻译 | 示例

摘要

The Lesotho Highlands Water Project is a multi purpose project aimed at developing the water resources of the mountainous region of Lesotho through a series of dams, tunnels, pumping stations and a hydro electric facility. The primary objectives of the project are to: Redirect some of the water flowing out of Lesotho towards population centres in South Africa Provide water supply, irrigation and regional development in Lesotho Generate hyro electric power utilising the redirected water.
机译:莱索托高地水项目是一个多用途项目,旨在通过一系列水坝,隧道,泵站和水力发电设施开发莱索托山区的水资源。该项目的主要目标是:将从莱索托流出的部分水引流到南非的人口中心,为莱索托提供供水,灌溉和区域发展,利用重新定向的水产生水力发电。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号