首页> 外文会议>Second Asian Particle Accelerator Conference Sep 17-21, 2001 Beijing, China >STATUS OF THE SUPERCONDUCTING CYCLOTRON PROJECT AT KOLKATA
【24h】

STATUS OF THE SUPERCONDUCTING CYCLOTRON PROJECT AT KOLKATA

机译:加尔各答超导回旋管项目的现状

获取原文
获取原文并翻译 | 示例

摘要

The superconducting cyclotron under construction at this Centre has K_(bend)=520 and K_(foc)=160. Fully stripped ions can be accelerated up to about 80 MeVucleon energy. All parts of the main magnet frame have already been machined. They are undergoing inspection tests at the vendor's site. Trial windings on a full-scale dummy bobbin have recently been completed to get hands on experience on the winding techniques, using an elaborate superconducting coil winding set up at VECC. Fabrication of the RF resonators is going on. The He liquefier/refrigerator has been operating on site for over a year now. Fabrication contract for the cryostat and related accessories has recently been awarded. The cryogenic transfer lines are in the process of finalization for awarding the contract. Several other sophisticated components and parts are being fabricated in-house. Construction of the building and support services is going on full swing. The experimentalists are planning for large-scale experimental facilities and are in the process of obtaining funds for the same.
机译:该中心正在建设的超导回旋加速器的K_(弯曲)= 520和K_(foc)= 160。完全剥离的离子可以加速到大约80 MeV /核子能量。主磁体框架的所有零件均已加工。他们正在供应商的现场进行检验测试。最近,在VECC上使用精心制作的超导线圈绕组,已经完成了在完整的模拟骨架上的试验绕组,以掌握绕组技术的经验。 RF谐振器的制造正在进行中。液化器/冰箱已经在现场运行了一年以上。最近已获得低温恒温器和相关附件的制造合同。低温传输线正在最后敲定中,以授予合同。内部正在制造其他一些复杂的零部件。建筑物和支持服务的建设正在进行中。实验人员正在计划大规模的实验设施,并正在为此筹集资金。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号