【24h】

Virtual Maintainability

机译:虚拟可维护性

获取原文

摘要

A project is underway at British Aerospace to enhance the maintainability of products and improve the efficiency of maintainability analysis within the design process. Phase 1 of the project was completed earlier this year. This 12 month phase consisted of a broad-raning requirements capture, technology and technique evaluation, and concept development. The requirements were derived from analysing business processes, projects, design, maintainability, human factors and maintenance disciplines, in-service support staff, customers and maintainers in the field.
机译:英国航空航天局正在进行一个旨在提高产品可维护性并提高设计过程中可维护性分析效率的项目。该项目的第一阶段已于今年年初完成。这个为期12个月的阶段包括广泛的需求捕获,技术和技术评估以及概念开发。需求是通过分析业务流程,项目,设计,可维护性,人为因素和维护纪律,在职支持人员,客户和现场维护人员得出的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号