首页> 外文会议>Rapid Excavation and Tunneling Conference(2007 RETC); 2007; Toronto(CA) >DESIGNING TO PROTECT ADJACENT STRUCTURES DURING TUNNELING IN AN URBAN ENVIRONMENT
【24h】

DESIGNING TO PROTECT ADJACENT STRUCTURES DURING TUNNELING IN AN URBAN ENVIRONMENT

机译:在城市环境中进行隧道传输时设计保护相邻结构

获取原文
获取原文并翻译 | 示例

摘要

The North Shore Connector Project for the Port Authority of Allegheny County involves TBM mining a pair of subway tunnels through soil and rock under the Allegheny River and a narrow city street. Along the tunnel alignment are a historic building on shallow foundations and modern buildings on deep foundations, one constructed directly over the alignment during the latter phases of design. This paper provides an overview of the general site conditions, and technical basis for excavation support and tunneling decisions. Deformation limits, ground improvement, monitoring and mitigation plans, geotechnical baseline report development, and risk management will also be discussed.
机译:阿勒格尼县港口管理局的北岸连接器项目涉及TBM在阿勒格尼河和一条狭窄的城市街道下开采穿过土壤和岩石的一对地铁隧道。沿隧道路线是一处浅层基础上的历史建筑和一处深层基础上的现代建筑,在设计的后期阶段直接在路线上建造一栋。本文概述了一般工地条件,以及开挖支护和隧洞决策的技术基础。还将讨论变形极限,地面改善,监测和缓解计划,岩土基准报告的开发以及风险管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号