The slurry wall technique has undergone an evolution from its invention to its today's status. In the early stages slurry walls were built with cable grab, later on with much stronger hydraulic grab and last but not least with the use of the cutter technique. The cutter allows thick walls with high verticality to extreme depths through hard soil and rock formations. With the rising demand of the construction of watertight diaphragm walls different joint systems have been developed. In addition to the rapid development of excavation systems it was necessary to improve slurry treatment and desanding plants, especially in conjunction with high performance trench cutters. Deep mixing methods can be used economically for the construction of cut-off or excavation support walls where other systems such as traditional soldier beams and lagging walls would yield unsatisfactory performance, where the installation of vibrated or driven sheet piles could cause vibration induced settlements and where concrete diaphragm walls would be time consuming and expensive. The new CSM method can largely replace the more conventional single or multiple auger methods of soil mixing or jet grouting. The cutter tool is similar to a cutter used in diaphragm walls or cut-off walls and is operated with a Kelly mounted on a drilling rig or rope suspended on a crane jib or mast of a base carrier. With this system much deeper walls can be installed and even hard soil layers can be penetrated.
机译:从发明到今天,泥浆墙​​技术已经发生了演变。在早期阶段,泥浆墙是通过电缆抓斗来建造的,后来通过强大的液压抓斗来建造,最后但并非最不重要的是使用切割器技术。该切割机可通过坚硬的土壤和岩石层,使垂直高度厚的厚壁墙达到极限深度。随着对水密隔墙构造的需求的增加,已经开发了不同的接头系统。除了快速发展的挖掘系统外,还必须改善泥浆处理和除砂设备,尤其是与高性能挖沟机结合使用时。深层搅拌法可经济地用于建造防渗或挖掘支撑墙,而其他系统(例如传统士兵横梁和落后墙)会产生不令人满意的性能,安装振动板或打入式板桩可能会引起振动引起的沉降,以及混凝土隔板墙既费时又昂贵。新的CSM方法可以在很大程度上替代更传统的土壤混合或喷射灌浆的单螺旋或多螺旋钻方法。该切割器工具类似于在隔板壁或隔断壁中使用的切割器,并且通过安装在钻机上的凯利或悬挂在基座支架的起重机悬臂或桅杆上的绳索来操作。使用此系统,可以安装更深的墙,甚至可以穿透坚硬的土壤层。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号