PUSHING THE ENVELOPE ― REHABILITATION OF THE CAMERON RUN TUNNELS

机译:追求包容-卡梅伦隧道的修复

获取原文

摘要

Rehabilitation work at the Cameron Run Tunnels entailed the restoration of seven heavily deformed, approximately 69 m long, steel liner plate supported culverts through a CSX Railroad embankment near Alexandria, Virginia. A custom fabricated expander, equipped with four 200-ton hydraulic jacks on two expansion arms was used to push back the liner plates encroaching into the proposed tunnel profile and install the steel set support. In a second phase the tunnels were then lined with 16 cm of fiber reinforced shotcrete. Geotechnical instruments both in the tunnels and on the railroad embankment were used to monitor the effects of the rehabilitation work on the two CSX Railroad tracks above the tunnels. Freight and passenger trains were required to run uninterrupted and at maximum speeds throughout construction.
机译:Cameron Run隧道的修复工作需要通过弗吉尼亚州亚历山大港附近的CSX铁路路堤修复七个大变形,长约69 m的钢衬板支撑涵洞。使用定制的膨胀机,在两个膨胀臂上配备了四个200吨液压千斤顶,以将侵蚀的衬板推回到拟议的隧道剖面中,并安装钢支架。在第二阶段,隧道衬砌着16厘米的纤维增强喷射混凝土。隧道和铁路路堤上的岩土仪器都被用来监测修复工作对隧道上方两条CSX铁轨的影响。货运和旅客列车在整个施工过程中必须不间断运行并以最高速度行驶。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号