Targeting a Large Open Pit Gold Mine at Mt Gibson, Western Australia — A Work in Progress

机译:针对西澳大利亚州吉布森山的大型露天金矿—正在进行中

获取原文
获取原文并翻译 | 示例

摘要

Oroya Mining Limited's Mt Gibson Gold Project, 280 km north east of Perth, is one of Western Australia's more recent discoveries of a major gold resource. Modern gold mining commenced in 1986, on a shallow laterite reserve of 6.62 million tonnes averaging 1.50 g/t gold. By the end of 1998, mining had progressed from an initial three shallow laterite pits to a series of 14 open pits with maximum depth of 100 m, on three separate trends with a combined strike length of over 10 km. The Project has yielded 868 400 ounces of gold from 16.5 million tonnes of ore at an average recovered grade of 1.64 g/t gold, from near surface laterite, supergene and primary sulfide ores. This includes a 160 m deep underground decline operation which mined 120 000 tonnes at an average grade of 9.1 g/t gold and a four million tonne Dump Leach on a synthetic base which yielded 68 900 ounces. The Project was placed on Care and Maintenance in 1999 pending drilling to refresh reserves. Hosted by strongly tectonised and altered Archaean volcanic rocks within and adjacent to a major regional shear, primary gold mineralisation occurs as structurally emplaced sulfide and quartz lodes. On the main Gibson Trend, multiple zones of mineralisation occur within a zone up to 600 m in overall width. The overall footprint of known mineralisation exceeds 20 km~2 and the potentially mineralised domain exceeds 100 km~2. The current estimate of a combined resource of 9.4 million tonnes averaging 2.47 g/t gold (749 500 ounces) is derived from a database of 10 500 drill holes, of which only four per cent test below 100 m vertical depth. Ore envelopes which remain open at depth and major gaps in the drilling pattern beyond the currently defined resources promise straightforward potential to define additional resources. Oroya Mining Limited and its joint venture partner Barrick Australia are targeting a major gold mining operation from this potentially world-class mineralised system. Oroya has the exclusive right to produce up to 500 000 ounces and is working toward the completion of a feasibility study into a resumption of mining using the existing 1986-built 1 Mtpa processing plant. The joint venture is in the early stages of testing the depth and lateral potential of the Mt Gibson mineralised system. Mining options currently under review include progressive open pit extension and amalgamation leading to one or more large open pits, and underground operations. It is too early in the development of the Project to offer definitive economic models of potential large-scale mining operations.
机译:Oroya Mining Limited在珀斯东北280公里处的吉布森山金矿项目是西澳大利亚州最近发现的主要黄金资源之一。现代金矿开采始于1986年,其浅红土储量为662万吨,平均金含量为1.50克/吨。到1998年底,采矿已经从最初的三个浅红土矿井发展到一系列14个露天矿井,最大深度为100 m,这是三个独立的趋势,总走向长度超过10 km。该项目从近地表红土,表土和原生硫化矿中开采了1,650万吨矿石,平均回收品位为1.64克/吨金,产生了868400盎司金。其中包括一个深度为160 m的地下探矿作业,该矿开采了12万吨平均品位为9.1 g / t黄金的矿山,以及在合成基础上开采了400万吨的自卸矿,总产量为68 900盎司。该项目于1999年进行“保养和维护”,等待钻探以更新储量。金矿的主要矿化作用是由构造变形的硫化物和石英矿床形成,并由主要区域剪切区内和附近的强烈构造和蚀变的太古宙火山岩主持。在主要的吉布森趋势上,总宽度不超过600 m的区域内发生了多个矿化带。已知矿化的总足迹超过20 km〜2,潜在的矿化范围超过100 km〜2。目前估计的综合资源为940万吨,平均金含量为2.47克/吨(749 500盎司),该数据库来自10 500个钻孔的数据库,其中只有4%的测试是在垂直深度100 m以下进行的。仍在深处保持敞开状态的矿石围护结构以及超出当前定义资源范围的钻探模式中的主要空白,有望带来定义其他资源的直接潜力。 Oroya Mining Limited及其合资伙伴Barrick Australia的目标是利用这一潜在的世界一流的矿化系统进行大型金矿开采。 Oroya拥有生产最多50万盎司黄金的专有权利,并且正在努力完成可行性研究,以使用现有的1986年建的1 Mtpa加工厂恢复开采。该合资企业尚处于测试吉布森山矿化系统深度和侧向潜力的早期阶段。目前正在审查的采矿选择包括逐步扩大露天开采和合并导致一个或多个大型露天开采以及地下作业。提供潜在的大规模采矿作业的确定的经济模型还为时过早。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号