首页> 外文会议>Production operation symposium >Water shutoff through fullbore placement of polymer gel in faulted and in hydraulically fractured producers of the prudhoe bay field
【24h】

Water shutoff through fullbore placement of polymer gel in faulted and in hydraulically fractured producers of the prudhoe bay field

机译:通过在普拉德霍湾油田的断裂和水力压裂生产商中通过全孔放置聚合物凝胶来堵水

获取原文
获取原文并翻译 | 示例

摘要

Selective shoutoff of undesired water influx by nonselective (fullbore) placement of treating chemicals has been successfully demonstreated in production wells of teh Prudhoe Bay field. This was accomplished through: (1) careful choice of candidates with known high conductivity water influx pathways (fault, hydraulic fracture, thief), (2) placement that exploited conductivity differences without zonal isolation, and (3) use of established polymer gel chemistry with previously demonstrated ability to shut off water preferentially to oil.
机译:通过非选择性(全孔)放置处理化学品来选择性抑制不希望有的水涌入,已在Prudhoe Bay油田的生产井中成功地进行了除恶魔处理。这是通过以下方式实现的:(1)仔细选择具有已知高电导率水流入途径(断层,水力压裂,小偷)的候选材料;(2)利用电导率差异而不进行区域隔离的位置;以及(3)使用已建立的聚合物凝胶化学具有先前证明的优先于油的关闭水的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号