Construction Methodology of Fill Placement over Sabkha

机译:萨布哈河填筑施工方法

获取原文
获取原文并翻译 | 示例

摘要

This paper documents field and laboratory testing performed on Sabkharnat a project site located in the Middle East. Constructability of placingrnfill material on Sabkha was assessed to ensure that temporary structuresrncould be built on the fill material overlying Sabkha. The fieldrninvestigation included: (1) performing seventeen field Dynamic ConernPenetrometer (DCP) Tests to estimate shear strength parameters andrnSabkha thickness, (2) excavating two test pits to collect compositernSabkha samples for geotechnical and chemical laboratory testing, (3)rnand conducting a field test pad to assess the required fill materialrnthickness over Sabkha for stability of operating equipment.rnLaboratory testing indicated low shear strength parameters and a highrnconcentration of chlorides and sulphates. Finally, field observationsrnfrom the field test pad indicated that in order for equipment to operaternin stable conditions during placement of the fill over Sabkha, thernthickness of the fill material must not be less than 70 cm. Constructionrnmethodology for fill material placement over Sabkha was developedrnand applied for construction of temporary structures.
机译:本文记录了在位于中东的项目站点Sabkharnat上进行的现场测试和实验室测试。评估了将填充材料放置在Sabkha上的可施工性,以确保可以在覆盖Sabkha的填充材料上建造临时结构。现场调查包括:(1)进行17场动态Conern骨密度仪(DCP)测试以估计抗剪强度参数和萨布卡厚度,(2)开挖两个测试坑以收集复合萨布卡样品以进行岩土和化学实验室测试,(3)进行现场测试垫以评估在Sabkha上所需的填充材料的厚度以确保操作设备的稳定性。实验室测试表明抗剪强度参数较低,氯化物和硫酸盐的浓度较高。最后,现场测试垫的现场观察表明,为了使设备在Sabkha上放置填充物时在稳定的条件下运行,填充物的厚度不得小于70 cm。开发了用于在萨布哈上空放置填充材料的施工方法,并将其应用于临时结构的施工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号