首页> 外文会议>Proceedings of the 9th joint convention of STAI amp; SISSTA >ENERGY CONSERVATION AT G.S.S.K. LTD. RAOSAHEBNAGAR, NHAVRE, TAL. SfflRUR DISTT. PUNE
【24h】

ENERGY CONSERVATION AT G.S.S.K. LTD. RAOSAHEBNAGAR, NHAVRE, TAL. SfflRUR DISTT. PUNE

机译:G.S.S.K.的节能LTD。塔拉(NHAVRE)的RAOSAHEBNAGAR。 SfflRUR DISTT。 NE

获取原文
获取原文并翻译 | 示例

摘要

Ghodganga S.S.K. Ltd., Raosahebnagar Tal. Shirw, Distt. Pune is a co-operative sugar factory situated at Nhavre having licensed capacity 2500 TCD & Plant was commissioned for its trial crushing during the Season-1996-97.Then after modernisation and addition in the machinery was done to improve the crushing rate with reduction in steam and power, which achieved considerable level by going for by-product unit like cogeneration and distillery unit to benefit the shareholders. Factory has achieved steam %cane from 50.80 during 1998-99 upto 36.63 during 2007-08. And power kwh/ton 31.48 during 1997-98 upto 12.50 kwh/ton. This has help to spare steam and power requirement of our newly commissioned 30 KLPD Distillary unit during season 2009-2010.
机译:Ghodganga S.S.K.有限公司,Raosahebnagar Tal。 Shirw,Distt。浦那(Pune)是位于纳夫尔(Nhavre)的一家合作制糖厂,其许可生产能力为2500 TCD,该厂于1996-97赛季开始试磨,之后进行了现代化改造并增加了机械设备,以提高破碎率并降低破碎率。蒸汽和电力,通过采用热电联产和酿酒厂等副产品部门使股东受益而达到了可观的水平。工厂从1998-99年的50.80%提高到2007-08年的36.63%的蒸汽%甘蔗。在1997-98年期间,电力千瓦时/吨为31.48,最高时为12.50千瓦时/吨。这有助于在2009-2010季节期间节省我们新投产的30 KLPD Distillary装置的蒸汽和动力需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号