首页> 外文会议>Proceedings of the tenth international conference on industrial management. >STUDY ON INTEGRATED COMMUNICATION MANAGEMENT OF CONSTRUCTION PROJECT BASED ON CONCURRENT ENGINEERING
【24h】

STUDY ON INTEGRATED COMMUNICATION MANAGEMENT OF CONSTRUCTION PROJECT BASED ON CONCURRENT ENGINEERING

机译:基于并行工程的建设项目集成通信管理研究

获取原文

摘要

Compared with traditional mode, the project management on Concurrent Engineering has many features, such as the large amount of information, more complex organizational interfaces, and more frequent conflicts and so on. In this paper, reengineerirg model of process and information was firstly established according to Concurrent Engineering theory. And matrix structure and technical support system are constructed. Finally, the integrated framework of communication management is established as the core of the project manager. The initial studies will enrich the theoretical system of project communication; also provide a sound basis for the smooth implementation of Concurrent Engineering.
机译:与传统模式相比,并发工程的项目管理具有信息量大,组织界面复杂,冲突频繁等特点。本文首先根据并行工程理论建立了过程与信息再造模型。并构建了矩阵结构和技术支持系统。最后,建立沟通管理的集成框架作为项目经理的核心。初步研究将丰富项目交流的理论体系;也为并行工程的顺利实施提供了良好的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号