首页> 外文会议>Proceedings of SUT International Conference on Subsea Technology and Deepwater Engineering >Investigation on Active Model Test Methods Based on the Deepwater Riser Installation Process
【24h】

Investigation on Active Model Test Methods Based on the Deepwater Riser Installation Process

机译:基于深水立管安装过程的主动模型测试方法研究

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

As the current hybrid model testing's environmental load and the boundary conditions at the truncated position of active truncation method are hard to control, the concept that simulates the process of installing deepwater riser on land is proposed for the first time.The similarity theory and the boundary conditions at the truncated position are deduced.Base on the study of model test for deep water projects, an active truncation approach of hybrid model testing for the installation of deepwater risers is introduced.The results show that the test device can simulate the SCR installation process well.It also lays the foundation for future works on deepwater projects.
机译:由于当前混合模型测试的环境负荷和主动截断法截断位置的边界条件难以控制,因此首次提出了模拟在陆地上安装深水立管的过程的概念。相似性理论和边界在深水工程模型试验研究的基础上,介绍了一种用于深水立管安装的混合模型试验的主动截断方法。结果表明,该试验装置可以模拟SCR的安装过程。很好,这也为深水项目的未来工作奠定了基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号