SUCCESSFUL REMEDIATION AT A FORMER MGP SITE IN A HIGHLY POPULATED URBAN SETTING

机译:在人口众多的城市环境中成功地修复了以前的MGP站点

获取原文

摘要

The former South Station manufactured gas plant (MGP) site, owned by The Peoples Gas Light and Coke Company (Peoples Gas) is approximately 4 acres in size, and is located in urban Chicago, along the Chicago River and directly adjacent to residential and light industrial properties. The MGP began operations as a production and storage facility in the late 1870’s and was dismantled between 1920 and 1961. In the early 1970’s a 41,600 square foot warehouse/building was constructed on the site and still exists. The initial interim remediation objective was to remove source material that was present at a depth of 30 feet bgs (20 feet below the river level) adjacent to the river and the building, underneath the building and on both the landward and river side of an earth retention system installed to facilitate source removal. Remediation was challenging because of concerns related to working adjacent to the river and the existing building, the proximity of a nearby playground and residential homes and current and future development of the City of Chicago’s ever expanding riverwalk system. In order to accomplish the remediation of this site, a state-of-the-art earth retention system was designed and constructed, to remain in place as a permanent dock wall. The system was also designed to conduct wet or dry excavation, as it was uncertain how successful dry excavation would be prior to commencement. Community related design considerations included intensive perimeter air monitoring, truck routing, truck tarping and washing, working hours, and street cleaning. Approximately 80,000 tons of impacted material was excavated, managed and disposed of offsite at an Illinois-approved landfill as special waste. Activities were conducted so that dry conditions were obtained for the majority of the excavation. Remediation activities exceeded the objectives in that the interim action was expanded to provide a permanent remedy and no further remediation is required. The project resulted in a 4 acre site suitably restored for industrial/commercial use, including use of the site’s 41,600 square foot building. Visual aesthetics were greatly improved from the residential and the river perspectives.
机译:人民煤气灯和焦炭公司(Peoples Gas)拥有的前南站人造煤气厂(MGP)场地面积约为4英亩,位于芝加哥市区,沿芝加哥河,与住宅和照明设施直接相邻工业性质。 MGP于1870年代后期开始作为生产和存储设施投入运营,并于1920年至1961年拆除。1970年代初期,该场地上建有41,600平方英尺的仓库/建筑物,至今仍然存在。最初的临时修复目标是,除去与河流和建筑物相邻,建筑物下方以及地球的陆地和河流一侧深度为30英尺桶(河平面以下20英尺)的源物质。安装了保留系统,以方便去除源。由于担心与河流和现有建筑物相邻的工作,附近的游乐场和民居的邻近以及芝加哥市不断扩大的河道系统的当前和未来发展等问题,整治工作具有挑战性。为了完成该场地的修复,设计并建造了最先进的挡土墙系统,以将其保留为永久性码头墙。该系统还设计用于进行湿法或干法开挖,因为尚不确定在开始之前干法开挖的成功程度。与社区相关的设计考虑因素包括密集的周边空气监测,卡车路线安排,卡车油布和清洗,工作时间以及街道清洁。在伊利诺伊州批准的垃圾填埋场中,约有80,000吨受影响的物料被作为特殊废物进行了异地挖掘,管理和处置。进行活动,以便为大部分挖掘工作获得干燥条件。补救活动超出了目标,因为临时行动已扩大为提供永久性补救措施,不需要进一步的补救。该项目产生了一个4英亩的场地,适合工业/商业用途进行了修复,包括使用该场地的41,600平方英尺的建筑物。从住宅和河流的角度来看,视觉美学得到了极大的改善。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号