首页> 外文会议>Proceedings of the Nickel-Cobalt 97 International Symposium August 17-20, 1997, Sudbury, Ontario, Canada >QNI Limited cobalt refinery: Process development, installation and operation
【24h】

QNI Limited cobalt refinery: Process development, installation and operation

机译:QNI Limited钴精炼厂:工艺开发,安装和运营

获取原文
获取原文并翻译 | 示例

摘要

QNI's nickel and cobalt refinery located at Townsville in north-east Australia is capable of processing 3.6 million wet tonnes of lateritic nickel ore each year. Laboratory bench scale and pilot plant studies to produce a high purity cobalt product were conducted in 1990 to 1996. A novel process in which the impurities are eliminated by a combination of solvent extraction and ion exchange resin treatment was patented. A 2,000 tpa nominal capacity cobalt plant was constructed during 1996 and full scale production of QN Cobalt Oxide Hydroxide containing low levels of impurities commenced in 1997.
机译:QNI位于澳大利亚东北部Townsville的镍和钴精炼厂每年可处理360万吨湿红土镍矿。在1990年至1996年进行了实验室规模的试验和中试工厂的研究,以生产高纯度的钴产品。通过溶剂萃取和离子交换树脂处理相结合消除杂质的新型工艺获得了专利。 1996年建成了年产2,000吨的标称钴厂,1997年开始全面生产含少量杂质的QN氢氧化钴氢氧化物。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号