首页> 外文会议>Proceedings of the Institute of Nuclear Materials Management (INMM) 46th annual meeting >Site-Specific Planning for Transition from US to NCCP Maintenance and Support -Operation of the MPCA Systems Installed under the Joint MPCA Program
【24h】

Site-Specific Planning for Transition from US to NCCP Maintenance and Support -Operation of the MPCA Systems Installed under the Joint MPCA Program

机译:从美国到NCCP过渡的站点特定计划维护和支持-在MPC&A联合计划下安装的MPC&A系统的操作

获取原文
获取原文并翻译 | 示例

摘要

This paper addresses the efforts of the joint US/Russian Novosibirsk Chemical ConcentratesrnPlant (NCCP) Material Protection Control and Accounting (MPC&A) team to prepare for therntransition of the installed MPC&A systems. This phase of the cooperation is an extension ofrnthe efforts during the design and implementation that included: involving protective force andrnproduction staff, matching the level of technology of comparable NCCP systems,rndevelopment of implementing procedures, and providing NCCP technical staff with training.rnNCCP is a commercial fuel fabrication facility producing research reactor and power reactorrnfuel with sales and profits providing sufficient funding to support the installed MPC&Arnsystems. The joint team defined three sets of parallel actions for transition based on thernNCCP structure and existing Russian regulations. The site-specific plan includes a shorttermrnMPC&A Office with defined tasks related to transition until the issuance of NCCPrnregulatory documents formalize these activities as part of the NCCP structure. One keyrnfeature of the plan is to ensure the long-term integration of MC&A and PP based on formallyrndocumented procedures. This paper describes the three sets of activities included in thernoverall transition plan, the key features of the NCCP structure impacting the long-termrnmaintenance and operation of the MPC&A systems, and the U.S. and NCCP roles during thernperiod of transition. The transition plan includes clear definitions of when U.S. support is nornlonger required for each system while recognizing there may be continuing areas ofrncooperation related to specific technical issues.
机译:本文介绍了美国/俄罗斯新西伯利亚化学浓缩工厂(NCCP)物质保护控制和会计(MPC&A)联合团队为准备安装的MPC&A系统的过渡所做的努力。合作的这一阶段是设计和实施过程中工作的扩展,包括:涉及保护部队和生产人员,使可比的NCCP系统的技术水平匹配,制定实施程序,并为NCCP技术人员提供培训。商业燃料制造设施,生产研究堆和动力堆的燃料,其销售和利润为支持已安装的MPC&Arnsystems提供了足够的资金。联合小组根据NCCP结构和俄罗斯现行法规定义了三套平行的过渡行动。特定于站点的计划包括一个短期MPC&A办公室,该办公室具有与过渡有关的明确任务,直到发布NCCP管理文件正式将这些活动作为NCCP结构的一部分为止。该计划的一项主要功能是确保在正式记录的程序的基础上将MC&A和PP进行长期整合。本文介绍了总体过渡计划中包含的三套活动,影响NCP结构的关键特征,影响MPC&A系统的长期维护和运行以及过渡期间美国和NCCP的角色。过渡计划包括明确定义何时不再需要每个系统的美国支持,同时认识到可能存在与特定技术问题相关的持续合作领域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号