首页> 外文会议>Proceedings of the IASTED International Conference on Energy and Power Systems >METHODS OF IMPROVING THE LIGHTNING PERFORMANCE OF 22 kV CIRCUIT UNDERBUILT ON 115 KV TRANSMISSION LINES
【24h】

METHODS OF IMPROVING THE LIGHTNING PERFORMANCE OF 22 kV CIRCUIT UNDERBUILT ON 115 KV TRANSMISSION LINES

机译:提高115 kV输电线路22 kV电路地下建筑防雷性能的方法。

获取原文
获取原文并翻译 | 示例

摘要

This paper presents the analysis of lightning overvoltages of 22 kV. Overhead distribution line underbuilt on 115 kV. Transmission line circuit to investigate the options for increasing the lightning performance. Improvement efforts could include better grounding, higher critical flashover voltage (CFO) and arresters installation. The analysis of lightning overvoltages are performed using ATPDraw version of ElectroMagnetic Transients Program (EMTP). Models of system studied have also been presented.
机译:本文介绍了22 kV雷电过电压的分析。架空配电线路的基础电压为115 kV。研究传输线电路中增加雷电性能的选择。改进工作可能包括更好的接地,更高的临界闪络电压(CFO)和避雷器的安装。雷电过电压的分析是使用ATPDraw版本的电磁暂态程序(EMTP)进行的。还介绍了研究的系统模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号