【24h】

Research of grid size issue on applying TOPMODEL in Chaohe catchment

机译:巢河流域应用TOPMODEL模型的网格大小问题研究。

获取原文
获取原文并翻译 | 示例

摘要

Estimation of the topography index is a key problem for TOPMODEL modeling performance. Besides the calculation method, the distribution of topographic index is closely linked to the DEM scale. The paper analyzed the change of the topographic index with different grid scale (ranging from 50 m to 600 m at 50 m intervals) and applied the methodology on a medium-size watershed-Chaohe catchment of 5340 square kilometers. The TOPMODEL was used to simulate daily hydrological process and to study the impact of DEM scale on topographic index and rainfall-runoff simulation. The results show that the distribution of the topographic index is very sensitive to the DEM scale. The area percentage of high topographic index increases with the DEM scale, which result in more accurate simulation of runoff during drought period with DEM scale larger than 300 m. On the other hand, more accurate simulation of the flood peak coincides with poorer simulation of daily discharge with the same grid scale.
机译:拓扑指数的估计是TOPMODEL建模性能的关键问题。除了计算方法外,地形指数的分布还与DEM规模紧密相关。本文分析了不同栅格尺度下(50 m至50 m到600 m间隔50 m)地形指数的变化,并将该方法应用于5340平方公里的中型流域—朝河流域。 TOPMODEL用于模拟日常水文过程,并研究DEM规模对地形指数和降雨径流模拟的影响。结果表明,地形指数的分布对DEM尺度非常敏感。高地形指数的面积百分比随DEM比例的增加而增加,这导致干旱期间DEM比例大于300 m的径流模拟更加准确。另一方面,在相同网格规模下,更准确的洪水峰模拟与较差的日排放模拟相吻合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号