首页> 外文会议>Proceedings of building simulation'91 >THE MODEL COUPLING PROBLEM: METHODS USED IN SOME BUILDING ANALYSIS TOOLS ANDTHE ALMETH PROPOSITIONS
【24h】

THE MODEL COUPLING PROBLEM: METHODS USED IN SOME BUILDING ANALYSIS TOOLS ANDTHE ALMETH PROPOSITIONS

机译:模型耦合问题:一些建筑分析工具和ALMETS命题中使用的方法

获取原文
获取原文并翻译 | 示例

摘要

The model coupling problem (MCP) is a general non trivialrnproblem raised by the universal choice of modularity as a conceptualrnbase for object programming and search for efficiency in softwarerntools development.rnDespite the apparent universality of the problem, it does notrnlead to a clear common formulation; on the contrary numerousrn"schools" of developers seem to dig gaps among the IBPSArncommunity.rnWe explore in this paper the origin of the misunderstanding, andrnpropose a tentative conceptual tool aiming towards an internationalrncomprehensive articulation of BPSA projects.
机译:模型耦合问题(MCP)是普遍的非平凡问题,它是由模块化的普遍选择作为对象编程和在软件工具开发中寻求效率的概念基础而提出的。尽管存在明显的普遍性,但它并没有导致明确的通用表述。相反,众多的开发商“学派”似乎正在挖掘IBPSA社区之间的差距。在本文中,我们探究了误解的根源,并提出了一种尝试性的概念性工具,旨在对BPSA项目进行国际全面的阐述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号