【24h】

Due Date Assignment Method based on LOMC

机译:基于LOMC的到期日分配方法

获取原文
获取原文并翻译 | 示例

摘要

In this paper a due date assignment (DDA) method based on LOMC control has been presented, which is named LDDA. As a capacity-driven approach, LDDA considered the influence exerted by LOMC mechanism and determined the possible release date of an arriving order, according to the workload information of the order and current available capacity of the manufacturing system. Therefore, the due date of the order could be obtained. Meanwhile, LOMC mechanism and the dispatching rule were adjusted to comply with the plan arranged by LDDA. Finally, simulation experiments were carried out to compare four controlling programs, containing DDA methods of LDDA, TWK and RTP. Simulation results show that LDDA outperformed TWK remarkably when LOMC was applied. Second, it concludes that when ORR is applied, the DDA method should consider the influence of ORR on the order's progress, otherwise it will depreciate the delivery performance. Third, it confirms ORR is not fit for those companies faced with fierce lead time competition, though helps to realize better performance on other aspects.
机译:本文提出了一种基于LOMC控制的到期日分配(DDA)方法,称为LDDA。作为一种能力驱动的方法,LDDA根据订单的工作量信息和制造系统当前的可用能力,考虑了LOMC机制施加的影响并确定了到达订单的可能下达日期。因此,可以获得订单的到期日。同时,对LOMC机制和调度规则进行了调整,以符合LDDA安排的计划。最后,通过仿真实验比较了四种控制程序,包括LDDA,TWK和RTP的DDA方法。仿真结果表明,当采用LOMC时,LDDA明显优于TWK。其次,得出的结论是,在应用ORR时,DDA方法应考虑ORR对订单进度的影响,否则会降低交货性能。第三,它确认ORR不适合那些面临交货时间激烈竞争的公司,尽管有助于在其他方面实现更好的业绩。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号