INSTRUMENTED HYBRID SHORING SYSTEM FOR A DEEP TEMPORARY EXCAVATION INCORPORATING CUTTER SOIL MIXING IN VANCOUVER, BC, CANADA

机译:加拿大不列颠哥伦比亚省温哥华市深埋临时开挖掺入切割机土壤的组合式混合支撑系统

获取原文
获取原文并翻译 | 示例

摘要

A hybrid shoring system consisting of cast-in-place soldier piles with Cutter Soil Mixing (CSM) infillrnpanels was constructed for temporary support of a 19.8 m (65 ft) deep excavation in Vancouver, BritishrnColumbia, Canada. Deep Mixing (DM) was completed up to 9.7 m (32 ft) in fill, peat, wood waste andrnclayey silt with embedment in dense till, and soldier piles constructed through the dense till extending tornbelow final excavation level. Two trial CSM panels were installed ahead of production to assist withrndeveloping the termination criteria of the CSM panels in the dense till. The constructed depth of the CSMrnpanels was based on interpretation of real-time monitoring data obtained through the Bauer B-tronicrnsystem. Inclinometer monitoring data from two CSM panels and two soldier piles, as well as soldier pilernsurvey target data was used to assess and monitor the performance of the hybrid shoring systemrnthroughout bulk excavation. The objectives of this paper are to provide an overview of the design andrnconstruction aspects of the hybrid DM shoring system and to present inclinometer and pile target data torndemonstrate the lateral performance of the CSM infill panels and soldier piles. This paper also discussesrnthe merits of using real-time monitoring data as part of the engineering decision-making process forrnvalidating CSM panel construction.
机译:在加拿大不列颠哥伦比亚省温哥华市,为临时支撑19.8 m(65 ft)深基坑而构建的混合支撑系统,该系统由现浇士兵桩和Cutter土拌合(CSM)填充面板组成。深层混合(DM)完成了9.7 m(32 ft)的填充,泥炭,木材废料和rnclayey淤泥,并埋入了密实的耕地中,并通过密实的耕地构造了士兵桩,并将其延伸至最终挖掘水平以下。在生产前安装了两个试验性CSM面板,以帮助制定CSM面板在密集耕作中的终止标准。 CSMrnpanels的构造深度基于对通过Bauer B-tronic系统获得的实时监控数据的解释。来自两个CSM面板和两个士兵桩的测斜仪监测数据,以及士兵桩测目标数据被用于评估和监测整个散挖过程中混合支撑系统的性能。本文的目的是概述混合DM支撑系统的设计和施工方面,并提供测斜仪和桩目标数据,以证明CSM填充板和士兵桩的侧向性能。本文还讨论了使用实时监视数据作为验证CSM面板结构的工程决策过程的一部分的优点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号