首页> 外文会议>Proceedings of the 1st international conference on sustainable construction amp; risk management.;vol.1. >Application of Improved Questionnaire in Recognizing of Risk Sources in Subway Station Construction with Open-Cut Method
【24h】

Application of Improved Questionnaire in Recognizing of Risk Sources in Subway Station Construction with Open-Cut Method

机译:改进问卷在明挖法地铁站建设风险源识别中的应用

获取原文
获取原文并翻译 | 示例

摘要

There are many uncertainty risks during the construction of tunnels and underground works, which are both significant and numerous. Risk analysis and assessment is fundamental for risk management in tunnel and underground engineering. In this paper, by analyzing the characteristics of subway station construction with open-cut method, accidents that have occurred, and extensive collection of relevant information, a more comprehensive risk sources in subway station construction with open-cut method are listed. Further more, improved questionnaire has been applied in construction site research, which shown that subjective information has been extracted accurately and accepted by a lot of people.
机译:在隧道和地下工程的建设中存在很多不确定性风险,这些风险既巨大又众多。风险分析和评估是隧道和地下工程风险管理的基础。本文通过对明挖法地铁车站建设的特点,发生的事故以及相关信息的收集进行分析,列出了明挖法地铁车站建设中较为全面的风险源。此外,改进的问卷已在建筑工地研究中得到应用,表明主观信息已被准确地提取并为许多人所接受。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号