首页> 外文会议>Proceedings of the 1983 annual conference on Computers : Extending the human resource >Computer budgeting of mineral holdings for a small scale mining operation
【24h】

Computer budgeting of mineral holdings for a small scale mining operation

机译:小型采矿作业的矿物资产的计算机预算

获取原文
获取原文并翻译 | 示例

摘要

This paper describes how a computer program handles the problems encountered in developing a mining budget from a large number of individual and widely scattered ore deposits. Among the difficulties overcome by the use of the program are constantly changing production forecasts requiring reworking of the budget, scheduling of the capacities of the offsite loading facilities, production rates requiring the mining of several properties concurrently while still maintaining quality control, and pressing time limits on several leases.

机译:

本文介绍了计算机程序如何处理从大量单个且分散分布的矿床中开发采矿预算时遇到的问题。使用该程序克服的困难包括不断变化的生产预测,需要重新调整预算,安排异地装载设施的产能,生产率要求同时开采多个矿产同时仍保持质量控制的生产率以及紧迫的时限。在几个租约上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号