Poland's First Large Combined CyclePower Plant In Lublin

机译:波兰卢布林的第一座大型联合循环发电厂

获取原文
获取原文并翻译 | 示例

摘要

In 2002 the new Lublin-Wrotków Combined Heat and Power Plant has been commissionedrnafter nearly five years of preliminary work and two years of project implementation. Thisrnplant is the first and still largest combined cycle power plant built in Poland. Extensive effortsrnhave been required to achieve closing for the project financing of the plant.rnThis paper shall describe these efforts, including financing aspects. The main design criteriarnas well as the choice of the equipment will be explained, together with erection andrncommissioning issues. One of the main topics will be the experience gained after putting thernplant into commercial operation with regard to performance, efficiency, availability andrnmaintenance.rnThe new plant is designed to operate at base load, and produces electric power in a single gasrnturbine of heavy duty type, with an output of 171 Mwe. Exhaust heat of the gas turbine isrnused for steam production in an unfired two-pressure HRSG. The steam serves a single steamrnturbine totalling the plant′s power output of 235 Mwe in the full condensing scenario. Thernheat production at nominal load is about 150 MWth. Natural gas is the main fuel for the gasrnturbine, while diesel oil is used as back-up fuel.rnThe main design criterion for the plant has been to serve the local district heating networkrnduring all the year, which resulted in a significant amount of heat produced during winterrnseason, with a corresponding load drop in the electric power generation. During the heatingrnseason the combined heat and power (CHP) unit provides the base load for the districtrnheating system, covering about 40 percent of the maximum heat demand. During summerrnoperation the unit covers the full demand of the municipal heating system which is muchrnlower than the nominal capacity of the plant. The electric power generated is sufficient tornfully satisfy the demand of the Lublin conurbation.rnThe installation of this new plant helps to reduce significantly the emission situation in thernregion, as the existing coal fired plant previously serving the whole district heating will bernused in the future only to cover the peak requirements.
机译:经过近五年的前期工作和两年的项目实施,新的卢布林-沃特科夫热电联产厂已于2002年投入使用。该工厂是波兰建造的第一座也是最大的联合循环电厂。为完成工厂的项目融资,需要付出大量的努力。本文将描述这些努力,包括融资方面。将说明主要的设计标准以及设备的选择以及安装和调试问题。其中一个主要主题是将电厂投入商业运营后在性能,效率,可用性和维护方面所获得的经验。新电厂设计为在基本负荷下运行,并通过重型燃气轮机发电,输出171 Mwe。燃气轮机的废热在未燃烧的两压HRSG中用于产生蒸汽。在完全冷凝的情况下,蒸汽为一台汽轮机提供蒸汽,总发电量为235 Mwe。标称负载下的热量产生量约为150 MWth。天然气是燃气轮机的主要燃料,而柴油则用作后备燃料。工厂的主要设计标准是全年为当地的区域供热网络服务,从而产生了大量的热量。在冬季,发电量相应减少。在供暖季节期间,热电联产(CHP)单元为区域供热系统提供了基本负荷,覆盖了最大供热需求的40%。在夏季运行期间,该设备可满足市政供热系统的全部需求,而该需求远低于工厂的标称容量。产生的电力足以满足卢布林城市化的需求。新工厂的安装有助于显着减少该地区的排放情况,因为以前为整个区域供热的燃煤电厂将来将仅用于满足高峰需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号