Lessons Learned in Planning the Dabhol LNG Terminal

机译:规划达博霍尔LNG接收站的经验教训

获取原文
获取原文并翻译 | 示例

摘要

The Dabhol LNG Terminal was a major LNG Port development on the West Coast of India in the late 1990’s that offers many valuable lessons for Port Development planning. The developers planned an LNG Receiving and Regassification Facility with an initial capacity of 2 MMTPA of LNG to supply a 2400 MW power plant. They hoped eventually to export an additional 3-5 MMTPA of natural gas by building a pipeline to supply the growing needs of the Mumbai-New Delhi area. The entire investment was on the order of $3 Billion US Dollars with the marine works alone in excess of $250 Million. This paper will discuss “Lessons Learned” in the planning and development of the Dabhol LNG Terminal that became apparent during construction. These lessons included the importance of site investigation, front end engineering design (FEED), and planning for remote site operations.
机译:达博尔LNG码头是1990年代后期印度西海岸的一项主要LNG港口开发项目,为港口发展规划提供了许多宝贵的经验教训。开发商计划建造一座LNG接收和重新安装设施,初始容量为2 MMTPA的LNG,为2400 MW的发电厂供电。他们希望通过建造一条管道来满足孟买-新德里地区不断增长的需求,最终再出口3-5 MMTPA的天然气。整个投资约为30亿美元,仅海洋工程一项就超过2.5亿美元。本文将讨论达博尔LNG接收站的规划和开发过程中的“经验教训”。这些课程包括站点调查,前端工程设计(FEED)和规划远程站点操作的重要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号