An experimental reinforced concrete pipe (RCP) installation is designed by University of Nebraska - Lincoln researchers and installed at the landfill of Lincoln, NE. The pipe installation consists of eight pipe segments, 48 in. (1219.2 mm) in diameter, installed under fill heights ranging from 5 ft (152.4 cm) to 20ft (609.6 cm). Pipe was designed according to a proposed design methodology, where, mostly the direct design method is followed while the 0.01" (0.254 mm) crack control criteria is eliminated. Four of the eight segments were over designed and the other four were under designed in terms of the height of fill they carry. Pipe segments were instrumented by eighty vibrating wire strain gages, and sixteen earth pressure cells. Field readings were obtained and monitored. The study is currently undergoing and the paper presents up-to-date findings of the experimental observations as well as inferences made regarding the RCP design considerations. Projected conclusions are such that the current design methods and criteria used for designing RCP are overly conservative.
机译:内布拉斯加州大学林肯研究人员设计了一种实验性钢筋混凝土管(RCP)安装,并安装在东北林肯的垃圾填埋场。管道安装包括八个直径为48英寸(1219.2毫米)的管段,其填充高度范围为5英尺(152.4厘米)至20英尺(609.6厘米)。根据建议的设计方法设计管道,其中大部分遵循直接设计方法,而消除了0.01“(0.254毫米)的裂缝控制标准。八个分段中的四个分段设计过度,其余四个分段设计不足用80个振弦式应变计和16个土压传感器对管段进行测量,获得并监测了现场读数,该研究正在进行中,本文介绍了该实验的最新发现关于RCP设计考虑因素的观察和推论预计的结论是,当前用于设计RCP的设计方法和标准过于保守。

著录项

  • 来源
    《Pipelines 2008 》|2008年|p.1-10|共10页
  • 会议地点 Atlanta GA(US)
  • 作者单位

    Department of Civil Engineering, University of Nebraska-Lincoln, 1110 south 67th street, Omaha, NE 68182-0178 PH (402) 554-2820 Fax (402) 554-3288 email: hmaximos@mail.unomaha.edu;

    rnDepartment of Architectural Engineering at University of Nebraska - Lincoln, Omaha, NE PH (402) 554-2035 eerdogmus@mail.unomaha.edu;

    rnCivil Engineering in the Department of Civil Engineering at University of Nebraska - Lincoln, Omaha, NE ACI Committees 318G, Code Prestressed Concrete of ACI: ACI-ASCE Committee 423-Prestressed Concrete, ACI-ASCE Committee 343-Concrete Bridges PH (402) 554-4842 mtadros@mail.unomaha.edu;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道运输 ;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号