TENNESSEE STATE ROUTE 385 OVER THE WOLF RIVER WETLANDS: A PRECAST SOLUTION

机译:田纳西州385号州际公路在湿河湿地上的定位:一种预先解决的方案

获取原文
获取原文并翻译 | 示例

摘要

Environmental considerations necessitated a change in the bridge required on State Route 385 over the Wolf River in West Tennessee. During preliminary design a 5-span, 720-ft long structure was proposed for the crossing. This evolved into a 33-span, 3,250-ft long structure composed of 4 continuous units which bridged not only the Wolf River, but adjacent wetlands as well.rnTo optimize economies of the major structure, both prestressed concrete and steel rolled shape girders were included as alternates in the contract plans. Both girder systems were designed incorporating simple for dead load, continuous for live load (SDCL) details.rnThermal displacements at 3 out of the 31 pile-bent substructures were accommodated with strip seal expansion joints located between “double-bents”. Pipe piles were designed for seismic loading and extended beyond liquefiable layers. Out-of-phase transverse seismic deformation of the “double-bents” was prevented with pipe restrainers to protect the expansion joints.rnThe bid cost of the bridge was $14,220,000 resulting in a unit price of $50 per square foot for the dual, 44-ft wide structures. All five bidders opted for the precast, prestressed girder alternate.
机译:出于环境方面的考虑,必须对西田纳西州沃尔夫河上的385号州际公路上的桥梁进行更换。在初步设计期间,提出了一种5跨度,720英尺长的结构用于穿越。它演变成33跨度,3,250英尺长的结构,由4个连续的单元组成,这些单元不仅桥接了沃尔夫河,而且还桥接了相邻的湿地。为了优化主要结构的经济性,包括了预应力混凝土和钢轧制大梁作为合同计划的替代方案。两种梁系统的设计都考虑了简单的静载荷载,连续的活荷载(SDCL)细节。rn在31个弯桩子结构中的3个中,有3个的热位移通过“双弯”之间的密封条伸缩缝来容纳。管桩是为承受地震载荷而设计的,并延伸到液化层之外。借助管道约束器保护伸缩缝,防止了“双弯”的异相横向地震变形。rn这座桥梁的竞标成本为14,22万美元,这使得双弯,44英尺单价为每平方英尺50美元。英尺宽的结构。所有五个投标人都选择了预制的预应力大梁替代方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号