首页> 外文会议>PCI 60th anniversary 2014 convention and national bridge conference >CONSTRUCTION STRESSES IN THE WORLD’S FIRST PRECAST NETWORK ARCH BRIDGE
【24h】

CONSTRUCTION STRESSES IN THE WORLD’S FIRST PRECAST NETWORK ARCH BRIDGE

机译:世界上第一个预制网络拱桥中的施工应力

获取原文
获取原文并翻译 | 示例

摘要

This paper reports some of the major findings from the instrumentation of the West 7th Street Bridge in Ft Worth, Texas. This innovative bridge, completed in 2013 as a replacement for a century-old bridge, consists of 12 prestressed, precast network arches. The arches were instrumented with 224 vibrating wire gages that were embedded in the arches prior to concrete placement. The gages were monitored during post-tensioning, handling, and transportation operations as well as deck construction. The instrumentation provided valuable data on the stresses induced in the arches, which were used to ensure a safe environment throughout construction. The measurements also provided a means for evaluating the accuracy of assumptions that were made during design. The results obtained from this study provide a unique insight into the behavior of concrete arches built by an accelerated construction method.
机译:本文报告了得克萨斯州沃思堡西7街桥的检测结果。这座创新的桥于2013年完工,以替代百年历史的桥,由12个预应力预制网拱组成。在拱门上安装了224个振弦规,在混凝土浇筑之前先将其嵌入拱门中。在后张紧,装卸,运输和甲板建造过程中对量规进行监控。该仪器提供了有关拱门中产生的应力的有价值的数据,这些数据用于确保整个施工过程中的安全环境。测量还提供了一种评估设计过程中假设准确性的方法。从这项研究中获得的结果为通过加速施工方法建造的混凝土拱门的性能提供了独特的见解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号