首页> 外文会议>PbZn 2010 >OPERATION OF THE SHERRITT ZINC PRESSURE LEACH PROCESS AT THE HBMS REFINERY: THE FIRST TWO DECADES
【24h】

OPERATION OF THE SHERRITT ZINC PRESSURE LEACH PROCESS AT THE HBMS REFINERY: THE FIRST TWO DECADES

机译:HBMS精炼厂的施瑞特锌加压浸出工艺的运行:第两个十年

获取原文
获取原文并翻译 | 示例

摘要

The Sherritt Zinc Pressure Leach Process has been applied successfully at the HBMS zinc plant inrnFlin Flon, Manitoba since 1993. The HBMS plant was the first commercial application of the two-stagernzinc pressure leach process, which allows for 100% production of zinc by direct leaching, in the absence ofrnroasters. Full design capacity in the pressure leach plant was established within a month of commissioningrnthe two-stage process in Flin Flon and additional zinc production has been achieved using the same leachrnvessels following installation of a larger cellhouse in 2001. Operating data collected since start-up of thernzinc pressure leach plant are discussed in this paper, along with a description of minor element behaviour.
机译:自1993年以来,Sherritt锌压浸工艺已在曼尼托巴省inrnFlin Flon的HBMS锌厂成功应用。HBMS厂是两级锌压浸工艺的首次商业应用,该工艺可通过直接浸出实现100%的锌产量,在没有roasters的情况下。压滤厂的全部设计能力在Flin Flon的分两个阶段调试后的一个月内就已建立,并且在2001年安装了一个较大的电解池后,使用相同的滤池实现了更多的锌生产。本文讨论了锌锌加压浸出装置,并描述了次要元素的行为。

著录项

  • 来源
    《PbZn 2010 》|2010年|p.505-516|共12页
  • 会议地点
  • 作者单位

    Sherritt Technologies, Sherritt International Corporation 8301 – 113 Street Fort Saskatchewan, AB, Canada T8L 4K7 mcollins@sherritttech.com;

    Hudson Bay Mining and Smelting Company, Ltd. P.O. Box 1500 Flin Flon, MB, Canada R8A 1N9;

    Hudson Bay Mining and Smelting Company, Ltd. P.O. Box 1500 Flin Flon, MB, Canada R8A 1N9;

    Hudson Bay Mining and Smelting Company, Ltd. P.O. Box 1500 Flin Flon, MB, Canada R8A 1N9;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 锌 ; 铅 ;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号