This paper describes the evolution of Buoy Supporting Risers (BSR), from inception to successfulrndeployment and full production in the Santos Basin development, offshore Brazil. It was a process thatrnstarted with the early engagement of the operator and contractors on concept and feasibility studies,rnthrough identification of potential application scenarios and into a fast track development of basicrnengineering, bidding, detailed design and construction. The process involved the early selection ofrndevelopment partners and the joint management of R&D and engineering in order to identify and developrnexisting and emerging technologies, as well as managing the construction of assets and identifyingrnmethodologies, all under a single commercial structure. Then, the specifications and work scopes werernjointly developed and fixed lump-sum prices were agreed, under a competitive bidding. This modelrnavoided the going back-and–forth and eliminated most of the delays, introducing a great deal ofrncollaborative spirit and transparency. In this case, following an initial feasibility engagement some 20rnyears before and the identification of a real application scenario, through the above process, it has beenrnpossible to develop the major BSR decoupled riser technology from concept selection to full productionrnmode in about five years. The major portion of such period is related to the complete execution of thernlargest EPIC SURF project executed in Brazil up to that date, where several world-first technologies werernimplemented in a harsh weather environment, allowing the operator to achieve the production ramp-uprnplan. In this journey, it took a lot of focus and tenacity from all involved parties to overcome majorrnchallenges and ensure that pioneer technology is implemented and available for further applications.
机译:本文介绍了浮标支撑立管(BSR)的演变过程,从巴西海上桑托斯盆地开发的开始到成功部署和全面生产。这个过程始于运营商和承包商尽早参与概念和可行性研究,通过识别潜在的应用场景,并快速发展基础工程,招标,详细设计和施工。该过程包括尽早选择开发合作伙伴以及对研发与工程进行联合管理,以识别和开发现有的和新兴的技术,以及管理资产的建设和识别方法,所有这些都在单一的商业结构下进行。然后,在竞争性招标下,共同制定了规格和工作范围,并商定了固定总价。该模型避免了来回回溯,并消除了大多数延迟,从而引入了很多协作精神和透明度。在这种情况下,经过大约20年的初步可行性研究并确定了实际的应用场景之后,通过上述过程,可能无法在大约5年的时间内将主要的BSR解耦立管技术从概念选择发展为全面生产模式。这段时期的大部分时间与该日期之前在巴西执行的最大的EPIC SURF项目的完全执行有关,该项目在恶劣的天气环境中采用了几项世界一流的技术,从而使运营商得以实现生产量提升计划。在此过程中,所有参与方都花费了大量精力和毅力来克服重大挑战,并确保先驱技术得以实施并可供进一步应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号