首页> 外文会议>American Institute of Mining, Metallurgical and Petroleum Engineers;American Institute of Chemical Engineers;American Association of Petroleum Geologists;Offshore Technology Conference >Lessons Learned From the Qualification Program and J-Laying Campaign of 12-Inch Steel Catenary Risers for the P55 Deepwater Project
【24h】

Lessons Learned From the Qualification Program and J-Laying Campaign of 12-Inch Steel Catenary Risers for the P55 Deepwater Project

机译:从P55深水项目的12英寸钢制悬链提升器的资格认证计划和J铺设活动中汲取的经验教训

获取原文
获取原文并翻译 | 示例

摘要

This paper reports the Lessons Learned from an innovative linepipe solution that was successfullyrnimplemented on P55 Deepwater Project. The P55 field is located offshore Brazil, in the northern area ofrnCampos Basin, in a water depth ranging from 1500m to 1900m. The scope of work consisted inrnengineering, procuring, fabricating and installing 16 rigid Steel Catenary Risers (SCRs), which are thernfirst of their kind in this area. The corresponding 12-inch SCR qualification results are presented in thernperspective to show the significant benefits of the technology used and its potential developments to HighrnPressure & High Temperature applications.rnIn order to meet tight Hi-Lo requirements together with high fatigue performances, innovative Pipe EndrnDesign and associated automatic welding procedures were developed and qualified. The paper describesrnthe complete sequence of pipe manufacturing process, from hot-rolling to final machining, which resultedrnin a concentric and reproducible pipe end geometry, ideal for limiting Stress Concentration Factors.rnAn extensive qualification program of Full Scale Fatigue test was conducted on girth-welded stringsrnand the associated results showed performance levels at least four times above the target curve. Moreover,rnLessons Learned from the offshore campaign established that developed Pipe End Design led tornsignificant improvements in welding times and subsequent J-laying rates. Details on how the technologyrneffectively reduces critical times and lowers rejection rates are provided on the basis of the actual P55rnoffshore campaign.rnIn addition to the advantages detailed in the paper, the presented linepipe solution proves to be alsornapplicable to High Temperature fields, since the enhanced fatigue behavior was found to compensate arntemperature derating up to 270°C. In fact, the presented manufacturing and welding technologies havernopened the perspective of ongoing Developments, which are believed to bring a reliable solution forrncombined High Pressure and High Temperature applications.
机译:本文报告了从P55深水项目成功实施的创新管道解决方案的经验教训。 P55油田位于巴西坎布斯盆地北部地区的海上,水深在1500m至1900m之间。工作范围包括工程设计,采购,制造和安装16台刚性钢悬链提升器(SCR),这是该领域的首创。相应的12英寸SCR认证结果也将在此展示,以显示所用技术的显着优势及其在高压和高温应用中的潜在发展。为了满足严格的Hi-Lo要求以及高疲劳性能,创新的Pipe EndrnDesign并开发了相关的自动焊接程序并进行了鉴定。本文描述了从热轧到最终加工的整个管道制造过程的顺序,这导致了同心且可重现的管道端部几何形状,非常适合限制应力集中系数.rn对环缝焊接进行了全面疲劳试验的广泛认证程序字符串和相关结果显示,性能水平至少比目标曲线高四倍。此外,从海上活动中学到的教训表明,开发的管端设计可显着缩短焊接时间和随后的J敷设速率。在实际的P55海上作业的基础上,提供了有关该技术如何有效减少关键时间并降低废品率的详细信息。rn除了论文中详述的优点之外,由于增强的疲劳性,所提出的管道解决方案也被证明也适用于高温领域。发现这种行为可以补偿温度降低至270°C的情况。实际上,提出的制造和焊接技术已经打开了正在进行中的开发的视野,据信这将为高压和高温应用的组合带来可靠的解决方案。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号