首页> 外文会议>Offshore Technology Conference;ExxonMobil;FMCTechnologies;Schlumberger >Collaboration with Client: Industry’s First Open-Head, Full Rotating High-Torque Bucking Unit Enables Makeup of Tubulars on Pipe Deck
【24h】

Collaboration with Client: Industry’s First Open-Head, Full Rotating High-Torque Bucking Unit Enables Makeup of Tubulars on Pipe Deck

机译:与客户的合作:业界首款开放式全旋转高扭矩屈曲装置,可在甲板上对管状件进行补漆

获取原文
获取原文并翻译 | 示例

摘要

The prevailing drive to develop innovative solutions to reduce rig time and associated costs, coupled withrnenhancing safety and optimizing operational efficiency, prompted a major Gulf of Mexico operator tornrequest a customized solution to allow make/break of drillpipe triples and casing doubles on itsrnspace-restricted deepwater production installation. Specifically, the operator sought a sustainable solutionrnthat would reduce operational costs by minimizing the online running of drill pipe, casing and tubing,rnwhile also reducing logistical hurdles and rig-floor hazards.rnThis paper describes the collaborative initiative that resulted in the engineering of a purpose-built piperndeck, which drove the development and deployment of the industry’s first open-head bucking unit andrnbespoke pipe transfer system designed to enable fingertip make-up and breakout of drill pipe triples andrndoubles of casing and tubing. At the onset, a number of challenges had to be addressed to meet thernoperator’s objective to vertically integrate the bucking and hands-free pipe transport system into the rig,rnwhich comprised a single-activity derrick with limited rack back capabilities. The authors will discuss therncradle-to-grave design process, which featured a cantilevered pipe bridge off of the rig floor to house thernnew bucking unit and pipe transfer system. Furthermore, owing to challenging well designs with increasedrnrisk of differential pipe sticking, the paper discusses the complementary design of positioning systems thatrndeliver record vertical lift and horizontal tong movement of 13 ft (4m).rnThe development of the hands-free bucking unit and integrated pipe transport system clearly illustratesrnthe intrinsic economic value of multi-party collaboration in creating operational efficiencies to reduce pipernprocess time, minimize or eliminate non-productive time (NPT), and deliver repetitive and predictivernoutcomes.
机译:不断开发创新解决方案以减少钻机时间和相关成本,以及提高安全性和优化运营效率的驱动力,促使墨西哥湾一家主要运营商要求定制解决方案,以使其在受限于太空的深水区域钻探三倍和套管倍增生产安装。具体而言,运营商寻求一种可持续的解决方案,即通过最大程度地减少钻杆,套管和油管的在线运行来降低运营成本,同时还减少物流上的障碍和钻机地板上的危险。本文介绍了导致目标设计的协作计划。建造的Pipeddeck,推动了业界首个开放式顶头屈曲装置和定制管道传输系统的开发和部署,该系统旨在实现指尖补足和钻探套管和油管的三倍和二倍断裂。刚开始时,为了满足铲油器将立柱和免提管道运输系统垂直集成到钻机中的目标,必须解决许多挑战,该系统包括单活动井架和有限的后架能力。作者将讨论从摇篮到坟墓的设计过程,该过程的特点是在钻机底板上悬置了一个悬臂式管桥,以容纳新的抗压单元和管道传输系统。此外,由于具有挑战性的井设计以及差动管卡住风险的增加,本文讨论了定位系统的互补设计,该系统可提供创纪录的垂直提升和水平钳运动13英尺(4m).rn免提屈曲装置和集成管的发展运输系统清楚地说明了多方协作在提高运营效率以减少流程时间,最小化或消除非生产时间(NPT)并提供重复性和预测性结果方面的内在经济价值。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号