首页> 外文会议>Offshore Technology Conference;ExxonMobil;Aseeder;Schlumberger >Stones Development: Best in Class Risk Reduction and Cost Improvement During Project Execution
【24h】

Stones Development: Best in Class Risk Reduction and Cost Improvement During Project Execution

机译:Stones Development:项目执行期间一流的风险降低和成本改善

获取原文
获取原文并翻译 | 示例

摘要

The Stones asset is an ultra-deepwater development located approximately 200 miles south of New Orleansrnin ~9500 feet of water (See Figure 1). Final investment decision was taken in 2013, with first productionrnachieved in September 2016. This development is part of the frontier Paleogene outboard play in the LowerrnTertiary Trend that targets the Upper and Lower Wilcox formations.rnIn early 2014, a change management program was kicked off, originally centered on minimizing wellrnconstruction risks. This change management program was organically grown, with cost and risk baselinesrnbeing re-assessed bottoms up, and key opportunities identified.rnMajor improvements were obtained in the areas of minimization of risk and capital investment duringrnthe period of 2014 to 2016. Improved risk and cost themes centered on: (a) enhanced trade-off betweenrnsubsea and well construction complexities; (b) improved subsurface imaging to increase flexibility inrnwell trajectories; (c) deepened integration between completion choices and well designs; (d) technicalrnfunctionality rationalization; and (e) supply chain improvements.
机译:Stones资产是一个超深水开发项目,位于新奥尔良(New Orleansrnin)以南约200英里(约9500英尺)的水深处(见图1)。 2013年做出了最终投资决定,并于2016年9月实现了第一批生产。该开发项目是LowerrnTertiary Trend的前沿Paleogene舷外作业的一部分,该目标针对上,下Wilcox地层。2014年初,实施了变更管理计划,最初的重点是最大程度地减少施工风险。该变更管理计划得到有机发展,重新评估了成本和风险基准,并确定了关键机会。rn在2014年至2016年期间,在最小化风险和资本投资方面取得了重大进步。改进了风险和成本主题着重于:(a)加强海底和油井建设复杂性之间的权衡; (b)改善地下成像,以增加井眼轨迹的灵活性; (c)加深完井选择与油井设计之间的整合; (d)技术功能合理化; (e)供应链的改善。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号