首页> 外文会议>North American tunneling 2014 proceedings >Risk Management for Design Build Projects
【24h】

Risk Management for Design Build Projects

机译:设计建造项目的风险管理

获取原文
获取原文并翻译 | 示例

摘要

On DB projects, risks of project design and development is transferred to a contractor at anrnearly stage and they are exposed to additional risks. The contractor takes risks of unknown and inadequaternproject and site conditions that have not been fully developed at the time of bidding. Although risk managementrnand risk sharing are accepted in underground construction projects and mega projects, not all owners see thernbenefits and some use inequitable risk sharing that contractor must cover in his pricing. This paper discussesrnrisk management issues and suggests partnering with the contractor in risk management.
机译:在数据库项目中,项目设计和开发的风险在较早的阶段转移给了承包商,因此他们面临额外的风险。承包商承担着未知和不足的风险,以及在招标时尚未充分开发的工地条件。尽管地下建筑项目和大型项目接受了风险管理和风险分担,但并非所有人都看到了好处,而且有些承包商使用了承包商必须在其定价中涵盖的不公平风险分担。本文讨论了风险管理问题,并建议在风险管理中与承包商合作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号