Finding a Balanced Contracting Approach to Pre‑Excavation Grouting

机译:寻找平衡的承包方法进行基坑预注浆

获取原文
获取原文并翻译 | 示例

摘要

Tunneling often requires pre-excavation grouting to reduce groundwater inflows and improvernground conditions. However, the work is expensive, the amount of grouting is a function of the contractor’srnmeans and methods, and its overall efficiency is debatable. Over the years, the industry has struggled withrndifferent payment mechanisms to administer this work, but typically few seem to assure the contractor ofrngetting through the ground while also allowing the owner to control cost and schedule overruns. This paperrnexamines a payment mechanism and contractual considerations used on the SFPUC’s New Irvington Tunnelrnthat may help meet these goals of cost and schedule control.
机译:隧道开挖通常需要预开挖注浆,以减少地下水流入并改善地面条件。但是,这项工作很昂贵,灌浆量是承包商的手段和方法的函数,其总体效率值得商bat。多年来,该行业一直在使用不同的付款机制来管理这项工作,但通常很少有人能保证承包商从地下钻研,同时还允许业主控制成本和安排超支。本文研究了SFPUC的新Irvington隧道所使用的付款机制和合同注意事项,这些措施可能有助于实现成本和进度控制的这些目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号