Trenchless Potpourri in Burlingame

机译:伯灵格姆的不干锅杂烩饭

获取原文
获取原文并翻译 | 示例

摘要

The City of Burlingame is in construction of the third of four phases of the Sanchez Bypass and NeighborhoodrnSewer Rehabilitation Project. The new pipeline was designed and constructed using guided auger boring (GAB),rnpilot tube method (PTM), horizontal directional drilling (HDD), as well as rehabilitation using pipe bursting, curedin-rnplace pipe lining (CIPP), and sliplining. The project includes over four miles of 6-inch to 18-inch sanitary sewerrnpipe. Open trench construction was used in some areas to construct a new sanitary sewer bypass, remove and replacernlaterals, remove and replace existing cleanouts, and construct new cleanouts and manholes in tight working spaces,rnrestrictive easements, and in residents’ back yards.rnGAB was used for an 18-inch crossing of a Caltrans right-of-way, which required a 24-inch steel casing. PTM wasrnused at three-8 and 10-inch crossings in steel casings in Old Bayshore Highway. Previous construction work in OldrnBayshore revealed old wooden piers, so a series of probes were installed to confirm the location of the boring. HDDrnwas used to install new sanitary sewers in tight alleyways. Pipe bursting upsized most 6-inch diameter pipe to 8-rninch pipe. CIPP was used in 8-inch and 10-inch sewers that had no major offsets, structural defects, or hydraulicrncapacity issues. Sliplining was used to convert an existing storm drain to a sanitary sewer.rnThis paper summarizes project constraints, design challenges, and construction issues associated with completingrnthe trenchless components of the sanitary sewer rehabilitation project.
机译:伯林格姆市正在建设桑切斯绕道和邻里污水管道修复项目四个阶段的第三阶段。新管道的设计和施工采用了导向螺旋钻(GAB),先导管法(PTM),水平定向钻探(HDD)以及使用爆管,硫化胶管衬(CIPP)和滑衬进行的修复。该项目包括超过4英里的6英寸至18英寸的卫生污水管。在某些地区使用明渠施工来建造新的卫生排水管旁路,拆除和更换支管,拆除和更换现有的清洁设施,并在狭窄的工作空间,限制性地役权和居民后院中建造新的清洁设施和沙井。用于18英寸穿越Caltrans的通行路,需要24英寸钢制外壳。在老湾岸公路的钢制外壳中,PTM在三到八英寸和十英寸的交叉口处被打碎。 OldrnBayshore先前的建筑工作揭示了旧的木墩,因此安装了一系列探头以确认钻孔的位置。 HDDrn曾用于在狭窄的小巷中安装新的下水道。爆管将最大直径为6英寸的管道扩大为8英寸的管道。 CIPP用于8英寸和10英寸的下水道,没有大的偏移,结构缺陷或水力容量问题。滑移衬砌用于将现有的雨水排放管道转换成卫生污水管。本文总结了项目约束,设计挑战以及与完成卫生污水管修复项目的非开挖构件相关的施工问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号