The Role of the 'Value for Money' Assessment Process in the Curtis Island, Australia, Multiple 2.1 Km HDD Project

机译:“价值”评估过程在澳大利亚柯蒂斯岛多个2.1公里HDD项目中的作用

获取原文
获取原文并翻译 | 示例

摘要

The Curtis Island Water and Sewerage Infrastructure Project includes the construction of potable water and sewerrnpressure mains between the Gladstone mainland and Curtis Island, Queensland, Australia to support proponentsrndeveloping liquefied natural gas (LNG) export facilities on Curtis Island. Completed within a compressed timescale,rnthe project includes the use of value driven processes and innovative solutions and approaches along with a numberrnfirsts for trenchless Technology in Australia.rnA simple process was used to establish a common view of project drivers and define what constituted ‘value forrnmoney’ in the decision making process. This provided a collective vision for major technical decisions andrninformed the approach to technical, risk management, contracting and fee arrangement decision making processes.rnThe project represents a number of milestone achievements for HDD technology in Australia:rn1.The crossing length of 2150m and 74m deep beneath Gladstone Harbour is one of the longest of its type inrnAustralia, requiring the use of steel enveloper pipes to reduce the risk of overstressing the HDPE productrnpipe during installation.rn2.Harbour crossings were completed using two of the largest HDD drilling rigs (500 Ton) available inrnAustralia.rn3.The risk of drilling fluid losses into the sensitive Harbour environment was minimised by the contractorsrnchoice of intersect drilling (drilling from both sides and meeting in the middle) – the first successful use ofrnthis approach in Australia.rn4.An Optical Gyroscope was used for the first time in Australia to undertake the complex down hole steeringrnoperation, completed 60m below the harbor bed level.rnThe first pilot hole was completed in December 2011 followed by the installation of 2 no DN 250 PN25 HDPErnpipes in May 2012 providing interim construction infrastructure for water and sewerage. Following the successfulrninstallation of the last steel enveloper, the DN 500 PN25 HDPE water pipe was finally pulled through in Februaryrn2013, and fully commissioned in June 2013.
机译:柯蒂斯岛供水与污水处理基础设施项目包括在格拉德斯通大陆与澳大利亚昆士兰州柯蒂斯岛之间建设饮用水和污水管网,以支持支持者在柯蒂斯岛上发展液化天然气(LNG)出口设施。该项目在压缩的时间内完成,包括使用价值驱动的流程,创新的解决方案和方法,以及澳大利亚无挖土技术的多项首创。一个简单的流程用于建立项目推动者的共识,并定义什么构成“价值货币”在决策过程中。这为主要技术决策提供了一个集体愿景,并为技术,风险管理,合同和费用安排决策过程的方法提供了信息.rn该项目代表了澳大利亚HDD技术取得的一系列里程碑式成就:rn1。交叉长度为2150m和74m深Gladstone港下方是inrnAustralia类型中最长的港口之一,需要使用钢制的包皮管来减少HDPE产品在安装过程中过度应力的风险.rn2。使用两个最大的HDD钻机(500吨)完成了过海承包商可以选择相交钻井(从两侧进行钻进并在中间相遇),从而最大程度地减少了钻井液流失到敏感海港环境中的风险,这是澳大利亚首次成功使用这种方法。rn4。光学陀螺仪在澳大利亚首次用于进行复杂的井下转向操作,完成于海港床高度以下60m。rn第一个先导孔于2011年12月完成,随后在2012年5月安装了2座DN 250 PN25 HDPE管道,为水和污水处理提供了临时建筑基础设施。在成功安装最后一个钢制封套后,DN 500 PN25 HDPE水管终于在2013年2月被拉通,并在2013年6月全面投入使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号