Roller Compacted Concrete under the Barrage Fuse Plug-A Technically Superior and Cost Effective Solution

机译:弹幕式保险丝塞下的碾压混凝土-一种技术优越且具有成本效益的解决方案

获取原文
获取原文并翻译 | 示例

摘要

Ghazi Barotha Hydropower Project is an off channel project on river Indus in Pakistan completed in 2003. The project has an installed capacity of 1, 450 MW of electricity. As a part of the project a barrage has been constructed over Indus river at Ghazi. The barrage incorporates a fuse plug to pass PMF of 46, 000m3/s. In the event of breach of the Fuse-plug embankment it is required that the foundation of the embankment should not erode so that plastic concrete cut-off wall connection to the embankment remains intact and subsequent reconstruction could start without delay. Several solutions were considered to control the erosion at the embankment base. Finally it was decided to provide a concrete pad under the entire foundation of embankment and the top of cut- off wall connected to it. Considering the huge size of the pad and construction time constraints it was not feasible to construct this pad with conventional concrete. Major part of the pad was therefore constructed using Roller Compacted Concrete (RCC). About 143,000m3 of RCC was placed in 73 days well within the schedule time. This paper describes the process of selection of RCC base pad under the fuseplug embankment, its design characteristics and control over its properties during construction.
机译:Ghazi Barotha水电项目是巴基斯坦Indus河上的一个离岸项目,于2003年完成。该项目的装机容量为1,450 MW。作为该项目的一部分,在加兹的印度河上修建了拦河坝。弹幕装有保险丝塞,可通过46,000m3 / s的PMF。万一熔断器路堤破裂,要求路堤的基础不应该被侵蚀,以便与路堤的塑性混凝土防渗墙连接保持完好无损,随后的重建工作应立即开始。考虑了几种解决方案来控制路堤基础处的侵蚀。最终决定在路堤的整个基础和与其连接的防渗墙的顶部下提供混凝土垫层。考虑到垫的巨大尺寸和施工时间的限制,用常规混凝土构造该垫是不可行的。因此,垫的主要部分是使用碾压混凝土(RCC)构造的。在计划的时间内,在73天内放置了约143,000立方米的RCC。本文介绍了在熔断器路堤下选择RCC基垫的过程,其设计特点以及在施工过程中对其性能的控制。

著录项

  • 来源
  • 会议地点 Guiyang(CN)
  • 作者

    Yuqing Pang; rnGuoxin Chen;

  • 作者单位

    Jahangir Akhtar@Vice President, National Engineering Services Pakistan (Pvt) Limited, Nespak House 1-C, Block -N, Model Town Extension, Lahore, Pakistan--Abdus Salam Khan@Principal Engineer, National Engineering Services Pakistan (Pvt) Limited, Nespak House, 1-C, Block -N, Model Town Extension, Lahore, Pakistan--;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 挡水坝;
  • 关键词

    RCC; fuseplug; erosion; cutoff; quality control;