The RCC Double-curvature Arch Dam of Linhekou Hydropower Project

机译:临河口水电站碾压混凝土双曲拱拱坝

获取原文
获取原文并翻译 | 示例

摘要

Linhekou hydropower project is located in Shaanxi province of China. Its RCC double curvature arch dam is maximally 96. 5m high and its dam's RCC concrete volume is about 224, 600m3, accounting for 74% of the total dam's concrete volume. The construction of the Linhekou hydropower project commenced in May, 2000, and the project started to store water on October 27, 2003. The dam has been operated normally for 4 years. Linhekou RCC concrete arch dam reflects the latest innovative technologies in China regarding the dam structure design, RCC concrete mix design, construction method, and quality control approach. This paper reports the key issues on the arch dam's design, construction and operation, which provides experiences that have the potential to be applied in other similar projects.
机译:临河口水电项目位于中国陕西省。它的RCC双曲拱拱坝最大高度为96. 5m,其大坝的RCC混凝土体积约为224、600m3,占大坝混凝土总量的74%。临河口水电站工程于2000年5月动工,2003年10月27日开始蓄水。大坝已正常运行了4年。临河口碾压混凝土拱坝反映了中国在大坝结构设计,碾压混凝土配合比设计,施工方法和质量控制方法方面的最新创新技术。本文报告了拱坝设计,建造和运营中的关键问题,这些经验提供了可在其他类似项目中应用的经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号