首页> 外文会议>New Progress on Roller Compacted Concrete Dams >Rapid RCC Construction Technology of Longtan Hydropower Dam Project
【24h】

Rapid RCC Construction Technology of Longtan Hydropower Dam Project

机译:龙滩水电站大坝RCC快速施工技术。

获取原文
获取原文并翻译 | 示例

摘要

Roller Compacted Concrete (RCC) construction features continuity, high intensity and rapidness. It can also guarantee the bound quality between layers. This article describes the main features of RCC rapid construction in terms of pouring methods, mechanical equipment, management system, workmanship, construction optimization and continuous construction of compacted concrete under high temperature etc. Using the well-matched RCC construction technology and sound management system, RCC construction intensity is highly improved, and world record is created that daily RCC placement intensity for one block for the main works reaches 15, 816m3/d in Longtan hydropower project.
机译:碾压混凝土(RCC)施工具有连续性,高强度和快速性的特点。它还可以保证层之间的绑定质量。本文从浇筑方法,机械设备,管理系统,工艺,施工优化和高温下的压实混凝土的连续施工等方面描述了碾压混凝土快速施工的主要特点。运用完善的碾压混凝土施工技术和完善的管理体系,碾压混凝土的施工强度大大提高,创造了世界纪录,龙滩水电站一期主工程的碾压混凝土日放置强度达到15,816m3 / d。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号