PRESENT STATUS AND FUTURE PLAN OF HTTR PROJECT

机译:高温气冷堆项目的现状和未来计划

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The HTTR project aims at demonstrating inherent safety features of High temperature gas-cooled reactors (HTGRs) by safety demonstration tests, and establishing nuclear heat utilisation technology by a hydrogen production demonstration test. The safety demonstration tests are divided to the first phase and second phase tests. In the first phase tests, simulation tests of anticipated operational occurrences and anticipated transients without scram are conducted. The second phase tests will simulate accidents such as a depressurisation accident (loss of coolant accident). The first phase safety demonstration tests have been carried out during FY 2002-2005, and the second phase tests are planned to start in FY 2006. A hydrogen production facility will be connected to the HTTR for the hydrogen production demonstration test to establish the coupling technology such as well as the procedure on safety design and evaluation. The coupling technology consists of safety-related one such as countermeasures against explosion of combustible gas and tritium permeation from helium gas to process gas and so on, and control ones for preventing thermal mismatch between reactor and hydrogen production facility. This report describes the present status and the future plan of the HTTR project.
机译:HTTR项目旨在通过安全演示测试来演示高温气冷堆(HTGR)的固有安全特征,并通过制氢演示测试来建立核热利用技术。安全演示测试分为第一阶段和第二阶段测试。在第一阶段的测试中,进行了预期的操作事件和预期的无扰动瞬变的模拟测试。第二阶段测试将模拟诸如降压事故(冷却液损失事故)之类的事故。第一阶段的安全示范测试已在2002-2005财政年度进行,第二阶段的测试计划于2006财政年度开始。制氢设施将与HTTR连接进行制氢示范测试,以建立耦合技术以及安全设计和评估程序。耦合技术包括与安全相关的技术,例如防止可燃气体爆炸和从氦气渗透到工艺气体的tri渗透的对策等,以及用于防止反应堆与制氢设备之间的热失配的控制技术。该报告描述了HTTR项目的现状和未来计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号