Mass Mining using Room and Pillar Methods at Estonia Oil Shale Mine

机译:爱沙尼亚油页岩矿使用机房和立柱法进行大规模采矿

获取原文
获取原文并翻译 | 示例

摘要

The Estonia Mine, operated by Eesti Energia Kaevandused AS (EEK), the mining division of thernEstonian Government’s energy company, Eesti Energia AS, is a large room and pillar mine located inrnEastern Estonia. It supplied approximately 4.9 Mt/a of oil shale in fi nancial year ending 2010, whichrnis used for electricity and shale oil generation. Due to the Estonian climate and the power station’srnneed for a dry product, Estonia Mine has developed a planning system where short-term demandsrnof the power stations dictate the schedule. Such an arrangement requires maximising fl exibility andrnconsequently the mine only operated for 199 days in 2010.rnThe footprint plays a key role in achieving mass mining rates as the 12 km × 12 km lease area allowsrnthe mine to split into mining districts that act independently of each other and maximise the numberrnof work areas available. Coupled with this, the geology of the mine is relatively homogenous over thernmining lease, simplifying the mine design and production methods.rnDuring the last five years, EEK has commissioned a comprehensive conveyor network.rnConsequently, material handling only requires loaders to dump oil shale direct from thernproduction face onto a chain conveyor that feeds the conveyor network that ultimately suppliesrnthe enrichment plant. Dewatering is also of critical importance, with 90 Mm3 of water dischargedrnannually. EEK uses large trenches up to 3.5 m deep and 1.2 m wide to channel groundwater.rnTrack mounted mechanical saws are used to cut slots in the floor, to control overbreak in blastingrnthese trenches.rnEEK has introduced Salzgitter Machinenbau GB 280S auger drills that drill three 280 mm diameterrnholes simultaneously. This has improved void hole drilling times and reduced the drilling requiredrnfor each face, reducing the overall production cycle time. Blasting activities have also been decoupledrnfrom other mining activities negating the need for fi ring times through the use of small independentrnfi rings, required to control vibrations.
机译:爱沙尼亚政府能源公司Eesti Energia AS的采矿部门Eesti Energia Kaevandused AS(EEK)运营的爱沙尼亚矿山位于爱沙尼亚东部,是一间宽敞的柱状矿井。截至2010财政年度,该公司每年提供约4.9 Mt /年的油页岩,该油用于发电和页岩油的生产。由于爱沙尼亚的气候和发电厂对干燥产品的需求,爱沙尼亚矿山开发了一个计划系统,由发电厂的短期需求决定时间表。这种安排需要最大限度地提高灵活性,因此该矿在2010年仅运营199天.rn足迹在实现大规模采矿率中起着关键作用,因为12 km×12 km的租赁面积允许该矿分成各自独立的采矿区其他并最大化numberrnof工作区可用。与此相伴的是,矿山的地质条件在矿山租约上相对统一,简化了矿山的设计和生产方法.rn在过去的五年中,EEK委托了一个全面的输送网络.rn因此,物料搬运只需要装载机直接将油页岩倾倒即可。从生产面到链式输送机,该输送机为输送机网络供料,最终为浓缩厂供料。脱水也是至关重要的,每年排放90 Mm3的水。 EEK使用最大深度为3.5 m,宽为1.2 m的大型沟渠来输送地下水。rn轨道安装的机械锯用于切割地板上的缝隙,以控制爆破沟渠的过度。rn EEK推出了Salzgitter Machinenbau GB 280S螺旋钻,可钻三个280毫米直径同时钻孔。这改善了空孔的钻孔时间,并减少了每个面的钻孔需求,从而缩短了整个生产周期。爆破活动也已与其他采矿活动脱钩,从而通过使用控制振动所需的小型独立环来消除了开火时间。

著录项

  • 来源
  • 会议地点 Fremantle(AU);Fremantle(AU)
  • 作者

    R Freeman; O Nikitin;

  • 作者单位

    SRK Consulting (UK) Ltd, 5th Floor, Churchill House, 17 Churchill Way, Cardiff CF10 2HH, United Kingdom. Email: rfreeman@srk.co.uk;

    Development Department, Eesti Energia Mining, Jaama tn 10, J?hvi 41533, Estonia. Email: oleg.nikitin@energia.ee;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿山开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号