The contiguous Kotre Basantpur and Pachmo (KBP) coal blocks in the Hazaribagh District ofrnJharkhand State in east India are being developed by Tata Steel Limited (Tata Steel) to supply cokingrncoal to a new steel mill at Kalinganagar in Orissa.rnThe planning challenges are many. The multiple coal seams range in thickness up to 6 m and extendrnto nearly 500 m depth, with dips up to 25° and highly variable quality. Several normal faults withrnthrows up to 150 m intersect the deposit. There is little room for waste dumping on the lease, severalrnlarge nalas (seasonal creeks) cross the blocks, and the KBP leases are not contiguous with Tata Steel’srnexisting mining operations at West Bokaro. Geotechnical conditions, while not well defi ned at thisrnstage, are largely unfavourable. There are several villages on the blocks, and extensive paddy fi elds.rnIn 2009, Adelaide Mining Consultants Pty Ltd (AMC) completed a Detailed Project Report (DPR)rnfor a production level of 8 Mt/a. A terrace mining system was proposed using 28 m3 hydraulicrnexcavators and 185 t trucks working horizontal up-dip slices. Subsequently the viability of in-pitrncrushing and conveying was assessed, but the full results were not available for this paper.rnIt is planned to extract a total of 147 Mt of raw coal at a strip ratio of 5.2 bank cubic metres per tonnern(bcm/t). The planned maximum pit depth is over 300 m.rnThe project includes a washery, a 2 × 25 MW fl uidised bed power station to utilise all the coarsernwashery rejects, and a railway spur line to carry the washed coal to the railhead some 7 km distant.
机译:塔塔钢铁有限公司(塔塔钢铁)正在开发印度东部贾坎德邦州哈扎里巴格区哈萨里巴格地区的连续Kotre Basantpur和Pachmo(KBP)煤块,向奥里萨邦卡林加纳加尔的一家新钢厂供应炼焦煤。规划的挑战很多。多个煤层的厚度最大为6 m,延伸到近500 m的深度,倾角最大为25°,质量变化很大。几个正断层的断层不超过150 m。租约上几乎没有废物倾倒的空间,数个大型纳拉斯河(季节性小溪)越过街区,KBP租约与塔塔钢铁公司在西博卡罗的现有采矿业务不相邻。尽管目前尚未很好地定义岩土条件,但在很大程度上是不利的。街区上有几个村庄,稻田也很广。2009年,阿德莱德矿业顾问有限公司(AMC)完成了详细项目报告(DPR),生产水平为8 Mt / a。提出了使用28 m3液压挖掘机和185 t卡车进行水平上倾切片的梯田采矿系统。随后评估了坑内破碎和输送的可行性,但无法获得本文的全部结果.rn计划以5.2立方米/吨(bcm / t)。计划的最大矿坑深度超过300 m.rn该项目包括一个洗煤厂,一个2×25 MW的流化床电站以利用所有的粗洗煤厂废品,以及一条铁路支线将洗过的煤运到相距约7公里的轨头。

著录项

  • 来源
  • 会议地点 Fremantle(AU);Fremantle(AU)
  • 作者单位

    FAusIMM, Managing Director, Adelaide Mining Consultants Pty Ltd, 298 Davies Road, Merrijig Vic 3723. Email: adelaidemining@bigpond.com;

    MAusIMM, General Manager Raw Materials Projects, Tata Steel Limited, Jamshedpur 831001, India. Email: rsrikanth@tatasteel.com;

    MAusIMM, Consulting Mining Engineer, Andrew Vidale Consulting Services Pty Ltd, Suite 1, Level 6, 68 Grenfell Street, Adelaide SA 5000. Email: andrew@vidaleconsulting.com;

    MAusIMM, Principal Geologist, GS Resources Pty Ltd, Suite 6, 1 Markey Street, Eastwood SA 5063. Email: grsgeo@ozemail.com.au;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿山开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号