首页> 外文会议>Modern rockfill dams-2009 >Effective and Economical Production of High Quality Concrete for Dams Shown on the Examples from Yewa Dam;Son La Dam;Se San QI and Ban Vae
【24h】

Effective and Economical Production of High Quality Concrete for Dams Shown on the Examples from Yewa Dam;Son La Dam;Se San QI and Ban Vae

机译:以Yewa大坝,Son La大坝,Se San QI和Ban Vae为例,显示了高效经济地生产优质大坝混凝土的方法

获取原文
获取原文并翻译 | 示例

摘要

Careful,special planning of the concrete mixing plants and material handling systems is required from storage of the aggregate and binders to placement of the concrete.When planning,it is important to address the requirements for a high production output of high quality as well as the economical production which has to be sustained over a lengthy period. The key considerations for the o-verall planning process are discussed in this article.
机译:从骨料和粘合剂的存储到混凝土的放置,都需要对混凝土搅拌站和材料处理系统进行仔细的专门计划。计划时,应对高产量和高质量的要求非常重要。必须长期维持的经济生产。本文讨论了总体规划过程的关键注意事项。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号