Summary of Face Slab Seepage Treatment in Sanbanxi Hydropower Station

机译:三板溪水电站面板渗流处理综述。

获取原文
获取原文并翻译 | 示例

摘要

Sanbanxi Hydropower Station is a concrete face rockfill dam with a maximum height of 185.5 m,the first 200 m-grade rockfill dam built with lithologically complicated materials,including very solid rocks and also strongly weathered rocks of lower strength.When the reservoir was filled for the first time in July 2007,local cracking was found in the joint of Phase I and II concrete slab,which resulted in a dramatic increase of dam seepage and failure of most instruments embedded in the joint. The process of slab failure and the technology of treatment are discussed herein to provide experience for the design,construction and operation management of similar dams.
机译:三板溪水电站是一座混凝土面板堆石坝,最大高度为185.5 m,是首座200 m级的堆石坝,采用岩性复杂的材料建造,包括非常坚硬的岩石以及强度较低的强风化岩石。 2007年7月,第一和第二阶段混凝土板的接缝处首次发现局部开裂,这导致大坝的渗漏急剧增加,并且大多数嵌入接缝处的仪器都发生了故障。本文讨论了平板破坏的过程和处理技术,以为类似大坝的设计,施工和运营管理提供经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号