Noise and vibration influence nearby structures besides the environment, which is an important issue at the construction fields these day when the vibration work is conducted. In fact, slope of the road that passes through the mountainous area may be affected by falling rocks due to the slope, joint or heavy rain, but it is not possible to ignore the fact that excessive vibration work can damage the side where rock is cut off during the road excavation. To secure slope's stability following large scale quantity site development, this research conducted Regression analysis on the Blasting influence with Test blasting to identify the effect of vibration on the Slope stability resulting at the time of rock blasting work starting from the initial stage of excavation, and considered the blasting vibration for the Estimation.
机译:噪声和振动会影响环境以外的附近建筑物,这是当今进行振动工作时在施工现场的一个重要问题。实际上,穿过山区的道路的坡度可能会由于坡度,接缝或大雨而受到掉落的岩石的影响,但是无法忽略这样一个事实,即过度的振动会损坏切岩石的一侧。在道路开挖期间关闭。为了确保大规模现场开发后边坡的稳定性,本研究对试验爆破的爆破影响进行了回归分析,以确定振动对从开挖初期开始的爆破工作产生的边坡稳定性的影响,以及在估算中考虑了爆破振动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号