首页> 外文会议>Mine land reclamation and ecological restoration for the 21 century >CONSTRUCTED WETLAND FOR MINE DRAINAGE TREATMENT LORBERRY JUNCTION WETLAND PROJECT
【24h】

CONSTRUCTED WETLAND FOR MINE DRAINAGE TREATMENT LORBERRY JUNCTION WETLAND PROJECT

机译:矿山排水工程建设的湿地覆盆子湿地项目

获取原文
获取原文并翻译 | 示例

摘要

A 0.931 ha constructed wetland for mine drainage treatment was installed in the Swatara Creek Watershed in Schuylkill County, Pennsylvania. The wetland is located within an interstate highway interchange. The project is unique in that it is designed to treat acid mine drainage in a stream that has a large flow, at times in excess of 54,500 m~3/day, and elevated pollutant concentrations. The upstream pH is 6.3, and upstream Fe concentration [Fe] is on the order of 10 mg/L. The wetland was completed during the spring of 1999. Preliminary water quality sampling results shows improvement to the quality of the stream. The project was a team effort that involved the Pennsylvania Departments of Environmental Protection (DEP), Transportation (PennDOT), and Conservation and Natural Resources (DCNR), the Schuylkill County Conservation District, EPA and many others. The design, coordination, construction, pitfalls, and results demonstrate the team effort that is needed to make a successful project.
机译:在宾夕法尼亚州舒克基尔县的Swatara Creek流域安装了0.931公顷的人工湿地进行矿山排水处理。湿地位于州际公路交汇处。该项目的独特之处在于,它设计用于处理流量大的酸性矿山排水,有时流量超过54,500 m〜3 / day,且污染物浓度较高。上游pH为6.3,并且上游Fe浓度[Fe]约为10mg / L。湿地在1999年春季完工。初步的水质采样结果表明溪流水质有所改善。该项目是由宾夕法尼亚州环境保护局(DEP),交通运输(PennDOT)和自然资源保护区(DCNR),舒克基尔县自然保护区,EPA和其他许多部门共同参与的一项工作。设计,协调,构造,陷阱和结果表明了完成一个成功项目所需的团队努力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号