首页> 外文会议>Mine Hazards Prevention and Control Technology >Numerical simulation of underground pressure in super-length working face
【24h】

Numerical simulation of underground pressure in super-length working face

机译:超长工作面地下压力的数值模拟

获取原文
获取原文并翻译 | 示例

摘要

Stress distribution surrounding the normal (160m) and super-length (400) working face were simulated with FLAC software.Underground pressure regularity of normal and super-length were contrasted and analyzed.The simulation results show that the first falling pace,first pressure pace and periodic pressure pace of super-length working face are less than that of the normal working face;the abutment pressure distributions of two length working face have the similar regularity.
机译:用FLAC软件对法向(160m)工作面和超长(400)工作面周围的应力分布进行了仿真,对法向和超长工作面的地下压力规律进行了对比和分析。仿真结果表明,第一下降速度,第一压力速度超长工作面的周期性压力步调小于正常工作面;两个长工作面的基台压力分布具有相似的规律性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号