This paper analyzes the impact of a large amount of wind generation on the Italian transmission network. The analysis takes into account the fact that the most suitable sites for installation of wind farms are located mainly in Southern Italy and that the power flows from wind turbines will arise in addition to the existing ones, mainly directed to Central Italy, thus increasing the possibility of network congestions. By means of a procedure of Optimal Power Flow the analysis determines any limitations to the full exploitation of wind generation capacity because of the constraints imposed by the transmission system, especially if not properly reinforced. Moreover, a sensitivity analysis, based on the nodal index Weighted Transmission Loading Relief (WTLR), assesses the impact of wind farms' generation on power system security. In any case the analysis aims at highlighting the need to complete the development plan of the Italian transmission system.
机译:本文分析了大量风力发电对意大利输电网络的影响。该分析考虑了以下事实:最适合安装风电场的地点主要位于意大利南部,除了现有的主要来自意大利中部的风力发电机外,还将出现来自风力发电机的功率流,因此增加了可能性网络拥塞。通过最佳功率流的过程,分析确定了由于输电系统施加的约束,尤其是如果没有适当加固的情况,对充分利用风力发电能力的任何限制。此外,基于节点指数加权传输负荷缓解(WTLR)的敏感性分析,评估了风电场发电对电力系统安全性的影响。无论如何,分析的目的是强调需要完成意大利传动系统的发展计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号